background image

9

OPTIONAL SHAMPOO SHELF INSTALLATION

TIME REQUIRED

1/2 - 1 HR

12

  4.  On the 2 tiles the Shampoo Shelf will be replacing, mark 1”  

    from the outside of the grout line, the cut-out area will be  

    10” x 22”. Cut out the hole for the Shelf. The smaller the  

    hole the better.
  5.  Dry-fit the Shampoo Shelf for alignment of grout lines.
  6.  Silicone in-place with a generous bead around the back of the  

    lip, wipe off excess silicone with tissue.

  1.  The Shampoo Shelf was designed to match your tile size.  

    (2) 12” x 12” tiles, the cut-out hole size is 10 x 22”.
  2.  There is a 1” lip or frame around the Shampoo Shelf, this will  

    be the water sealed area for the Shampoo Shelf.
  3.  The best way to cut the hole is with a small 5” round  

    diamond blade, and with a jigsaw to cut the corners.
  

See detailed instructions enclosed with Shampoo Shelf

GLASS DOOR & PANEL INSTALLATION (if ordered)

13

diagram 17

Note: Two people are required for this installation. Take careful measurements before 

cutting or drilling products. 

A - Handle Installation

 

1.  Set the glass door in a position to enable the assembly of the handle. 

(diagram 16)

  2.  Loosen the set screws so you can separate the handles.
  3.  Unscrew the long bolt from the handle. Keep all rubber pieces attached to the screw.
  4.  Remove the first set of flat, clear washers from the bolt.
  5.  Start with the top hole on the glass door. Place the long bolt through the hole in the door  

    (keeping the remaining rubber pieces on the bolt). On the other side of the glass place the flat  

    washers onto the threaded portion of the bolt. 

 

6.  Take one side of the handle and screw the long bolt into the end. Just start the bolt until a few  

    threads catch. Keep loose.

 

7.  Put the second bolt through the lower hole. Place the flat washer onto the bolt. Screw the bolt  

    into the bottom handle. 
  8.  Align the handle on the door and carefully tighteb the long bolts. Do not over tighten.
  9.  Place the opposite handle over the long bolts and tighten the set screws to secure the handle.

B - Hinge Installation

 

1.  Locate the top hinge and remove the side plate by loosening the two screws. 

(diagram 17)

 

2.  Place the hinge into the top cutout on the door so the screws will be facing into the shower  

    and install the side plate. Tighten the screws until the hinge is secure. Make sure the hinge is  

    centered in the cutout and that the screws are facing into the shower. 

Be careful not to rest the edges of the door on hard 

surfaces. Tempered glass is very strong and impact 

resistant but its weakest point is impact on the edges.

diagram 16

clear washer

clear spacer

clear washer

set screw

shower

inside

shower

outside

hinge pin

side plate

screws

door

Содержание Sistine Stone Neo Corner-Hnf

Страница 1: ...Installation Preparation Work which may include plumbing relocation drain location and bathroom demolition Prior to demolition scheduling a contractor or building your shower double check that you hav...

Страница 2: ...AINST APPROPRIATE PACKING LIST Make sure you have received all the items necessary for the installation This will also familiarize you with all the parts and hardware you will need to install your sho...

Страница 3: ...flush 1 4 cement board 2 x 4 stud metal flange pan diagram 1 floor of pan silicone bead It is easier to check alignment of studs and pan without the drain installed into the pan Place the pan in the p...

Страница 4: ...drain collar pan 6 rubber gasket 7 teflon slide ring 8 drain lock nut apply silicone around drain collar sides and under lip floor hole with 2 drain pipe diagram 3 1 Remove the shower pan to a safe l...

Страница 5: ...t based product like Wonderboard or Hardibacker may also be used if it meets your local codes Some codes require a vapor barrier to be installed as well We recommend a water vapor barrier of 6 mil pla...

Страница 6: ...e extensively bowed they can be easily flattened before installation See trouble shooting section on last page for details B Test Alignment by Dry fitting Wall Panels Liners 1 Place your first bottom...

Страница 7: ...proper amount you will need for the project based on your shower size Depending on the size and threshold type of your shower you will need from 10 20 9 8 oz tubes of silicone to complete your shower...

Страница 8: ...ordered there are 2 special cap trim pieces and 2 special notched bottom left and right pieces 1 Locate all the trim pieces and align them on the floor diagram 13 2 Apply silicone using a zig zag patt...

Страница 9: ...tached to the screw 4 Remove the first set of flat clear washers from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber...

Страница 10: ...distance from each wall threshold Take all measurements from the outside edges of the glass 3 Measure the positioning of the glass panels to endure they are in the correct position Make sure the glas...

Страница 11: ...s your preference 8 After everything is lined up correctly remove the header pieces D Dry Fit Door Header The door can pivot with the hinges on the left or right side depending on your preference We w...

Страница 12: ...to the glass panels Be sure to align them to the header center section diagram 26 10 Allow the silicone to dry before continuing with the installation Make sure the glass remains in the proper positio...

Страница 13: ...circular motion to avoid dis coloration The stone is naturally waterproof and will not absorb spills or soil simply wipe away with a damp sponge Periodic cleaning with a sponge and warm soapy water w...

Страница 14: ...13395 Estelle Street Corona California 92879 Phone 800 454 2284 Fax 951 734 1480 Visit us at www americanbathfactory com NOTES...

Отзывы: