background image

3

OPTIONAL ITEMS

3

PRE-INSTALLATION TEAR DOWN

FAUCETS

SHAMPOO BOX

SHOWER BENCH

TIME REQUIRED

8-16 HRS

This shower system is designed to be installed on a bare floor. It is necessary for any existing shower to be completely removed.  

Tear out and remove all old material to expose the 2 x 4 wall studs. Clean up the shower area, removing all dust and old material from the area.

4

DRY-FITTING THE PAN

TIME REQUIRED

½ to 1 HR

3/4” overhang when using triple studs, no overhang when using 

double studs (double studs required, triple studs recommended for 

extra strength.

11” for shampoo shelf

triple studs

3/4” overhang

11”

minimum gap 

required for the 

shampoo shelf

diagram 2

Studs may need slight trimming to 

allow pan to set flush.

1/4” cement board

2 x 4 stud

metal flange

pan

diagram 1

floor of pan

silicone bead

It is easier to check alignment of studs and pan without the drain installed into the pan. Place the pan in the planned position. Check to see that the spacing 

between the pan and 2 x 4 studs are flush. Some shims may be required to plumb walls with the pan. By screwing in the 1/4” cement board the metal flange 

will pull fast to the studs, and will secure the metal pan in place. 

(diagram 1)

With the pan in position, check to make sure the 2” drain pipe is in the center of the pan drain hole. 

(diagram 2) 

Use the drain collar #5 by itself; remove the 

rubber seal, nut and gaskets from the drain assembly. 

(diagram 3, next page)

 Push the drain collar #5 into the drain hole between the pan and the 2” pipe.  

With the drain collar pushed flush to the pan surface, the 2” drain pipe should not extend past the inside threads of the drain collar #5.

Содержание Sistine Stone Neo Corner-Hnf

Страница 1: ...Installation Preparation Work which may include plumbing relocation drain location and bathroom demolition Prior to demolition scheduling a contractor or building your shower double check that you hav...

Страница 2: ...AINST APPROPRIATE PACKING LIST Make sure you have received all the items necessary for the installation This will also familiarize you with all the parts and hardware you will need to install your sho...

Страница 3: ...flush 1 4 cement board 2 x 4 stud metal flange pan diagram 1 floor of pan silicone bead It is easier to check alignment of studs and pan without the drain installed into the pan Place the pan in the p...

Страница 4: ...drain collar pan 6 rubber gasket 7 teflon slide ring 8 drain lock nut apply silicone around drain collar sides and under lip floor hole with 2 drain pipe diagram 3 1 Remove the shower pan to a safe l...

Страница 5: ...t based product like Wonderboard or Hardibacker may also be used if it meets your local codes Some codes require a vapor barrier to be installed as well We recommend a water vapor barrier of 6 mil pla...

Страница 6: ...e extensively bowed they can be easily flattened before installation See trouble shooting section on last page for details B Test Alignment by Dry fitting Wall Panels Liners 1 Place your first bottom...

Страница 7: ...proper amount you will need for the project based on your shower size Depending on the size and threshold type of your shower you will need from 10 20 9 8 oz tubes of silicone to complete your shower...

Страница 8: ...ordered there are 2 special cap trim pieces and 2 special notched bottom left and right pieces 1 Locate all the trim pieces and align them on the floor diagram 13 2 Apply silicone using a zig zag patt...

Страница 9: ...tached to the screw 4 Remove the first set of flat clear washers from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber...

Страница 10: ...distance from each wall threshold Take all measurements from the outside edges of the glass 3 Measure the positioning of the glass panels to endure they are in the correct position Make sure the glas...

Страница 11: ...s your preference 8 After everything is lined up correctly remove the header pieces D Dry Fit Door Header The door can pivot with the hinges on the left or right side depending on your preference We w...

Страница 12: ...to the glass panels Be sure to align them to the header center section diagram 26 10 Allow the silicone to dry before continuing with the installation Make sure the glass remains in the proper positio...

Страница 13: ...circular motion to avoid dis coloration The stone is naturally waterproof and will not absorb spills or soil simply wipe away with a damp sponge Periodic cleaning with a sponge and warm soapy water w...

Страница 14: ...13395 Estelle Street Corona California 92879 Phone 800 454 2284 Fax 951 734 1480 Visit us at www americanbathfactory com NOTES...

Отзывы: