SIDE THRESHOLD PLUMB LINE

TIME REQUIRED

½ HR

6

plumb line

(draw both sides)

diagram 6

To help with the wall installation, use a level and draw a plumb line from the inside of the floor 

threshold up to the top of the shower. Do this on both sides. This line will be where the side threshold 

and the wall panels meet, this will give you a visual reference point when dry-fitting your wall panels.

WALL PANEL/LINER INSTALLATION

TIME REQUIRED

3-4 HR

A - Inspecting Wall Panels/Liners

Inspecting panels at this point will give you confidence that the wall panels are straight and square from the factory. When installing wall panels, you may need to 

make adjustments to the panels to accommodate for unevenness of your existing walls. During the inspection process and/or dry-fitting process, if you have any 

concerns about the alignment or fit of the wall panels, please call 1-800-454-2284 for customer service, and we will gladly assist you with your installation.
 

1.  Find a large empty area to layout and inspect all panels.

 

2.  Align all panels and liners to check for straightness. Make sure grout lines are straight and square  

 

  to each other.

 

3.  Sistine Stone wall panels are made to be flexible. (Warning - Store on a flat area.) If wall panels  

 

  have been stored improperly or seemingly have become extensively bowed, they can be easily   

 

  flattened before installation 

(See trouble shooting section on last page for details).

 

B - Test Alignment by Dry-fitting Wall Panels/Liners

 

1.  Place your first bottom panel 2B into position. 

(diagram 7). 

Rest 2B panel onto the pan floor;   

 

  use spacers between the floor and the panel to make the top of the panel level.

 

2.  Place the second bottom panel 1B into position, push the two panels together. Make sure the   

 

  grout lines are aligned, use spacers to make the top of the panel level. Inspect the spacing    

 

  between the wall panels and the side threshold plumb line.

 

3.  Depending on your cement board alignment, some sanding of the wall panel edges may be    

 

  required for a tight fit.

 

4.  Place liners 1L and 2L in position check for level and length.

 

5.  Holding the upper panels and liner in place with screws and blocks or another person, place 2L   

 

  into position. Check the length and overlap alignment. Some fitting may be required.

 

6.  Place 2T into position. 

(diagram 8)

 

7.  Place 1T into position. Depending on your faucet selection, you may need to mark and cut out   

 

  holes for your faucet to fit through before you can place the panel into position. Remember    

 

  “measure twice, cut once”, you can cut our walls with most cutting tools. (See installation    

 

  video at www.americanbathfactory.com). Now you can check for level, grout line alignment and  

 

  spacing between walls and plumb line.

 

8.  Check that 1LT &  2LT  (top liners) fit properly on top.

diagram 8

2T

2L

1L

10

1B

2B

2B

diagram 7

2LT

Содержание Sistine Stone Neo Corner-Hnf

Страница 1: ...Installation Preparation Work which may include plumbing relocation drain location and bathroom demolition Prior to demolition scheduling a contractor or building your shower double check that you hav...

Страница 2: ...AINST APPROPRIATE PACKING LIST Make sure you have received all the items necessary for the installation This will also familiarize you with all the parts and hardware you will need to install your sho...

Страница 3: ...flush 1 4 cement board 2 x 4 stud metal flange pan diagram 1 floor of pan silicone bead It is easier to check alignment of studs and pan without the drain installed into the pan Place the pan in the p...

Страница 4: ...drain collar pan 6 rubber gasket 7 teflon slide ring 8 drain lock nut apply silicone around drain collar sides and under lip floor hole with 2 drain pipe diagram 3 1 Remove the shower pan to a safe l...

Страница 5: ...t based product like Wonderboard or Hardibacker may also be used if it meets your local codes Some codes require a vapor barrier to be installed as well We recommend a water vapor barrier of 6 mil pla...

Страница 6: ...e extensively bowed they can be easily flattened before installation See trouble shooting section on last page for details B Test Alignment by Dry fitting Wall Panels Liners 1 Place your first bottom...

Страница 7: ...proper amount you will need for the project based on your shower size Depending on the size and threshold type of your shower you will need from 10 20 9 8 oz tubes of silicone to complete your shower...

Страница 8: ...ordered there are 2 special cap trim pieces and 2 special notched bottom left and right pieces 1 Locate all the trim pieces and align them on the floor diagram 13 2 Apply silicone using a zig zag patt...

Страница 9: ...tached to the screw 4 Remove the first set of flat clear washers from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber...

Страница 10: ...distance from each wall threshold Take all measurements from the outside edges of the glass 3 Measure the positioning of the glass panels to endure they are in the correct position Make sure the glas...

Страница 11: ...s your preference 8 After everything is lined up correctly remove the header pieces D Dry Fit Door Header The door can pivot with the hinges on the left or right side depending on your preference We w...

Страница 12: ...to the glass panels Be sure to align them to the header center section diagram 26 10 Allow the silicone to dry before continuing with the installation Make sure the glass remains in the proper positio...

Страница 13: ...circular motion to avoid dis coloration The stone is naturally waterproof and will not absorb spills or soil simply wipe away with a damp sponge Periodic cleaning with a sponge and warm soapy water w...

Страница 14: ...13395 Estelle Street Corona California 92879 Phone 800 454 2284 Fax 951 734 1480 Visit us at www americanbathfactory com NOTES...

Отзывы: