C - ns alling Panels
1.
2.
. ress the all rmly nto pos t on. e s re to se spacers et een the
ottom panel an the sho er pan to ens re panel s le el.
a ram 1
. nstall the rema n n panels n the ollo n or er
L L
diagram
L
L
. Match the space et een the panels th the rest o the ro t l nes
on the panel. se spacers necessary to ma e the alls s are an
stra ht.
OPTIONAL SHAMPOO SHELF INSTALLATION
M
1/2 - 1 HR
11
. On the 2 t les the hampoo hel ll e replac n
mar 1 rom the o ts e o the ro t l ne the c t-
o t area ll e 1 22 . C t o t the hole or the
hel . he smaller the hole the etter.
. ry- t the hampoo hel or al nment o ro t
l nes.
. s n 1
l cone n-place th a enero s
ea aro n the ac o the l p pe o e cess
s l cone th t ss e.
1. he hampoo hel as es ne to match yo r t le
s e. 12 2 t les the c t-o t hole s e s 1 22 .
2. here s a 1 l p or rame aro n the hampoo hel
th s ll e the ater seale area or the hampoo
hel .
. he est ay to c t the hole s th a small ro n
amon la e an th a sa to c t the corners.
ee de ailed ins r
ions en losed i am oo
el
WALL PANEL/LINER INSTALLATION
(continued)
M
3-4 HR
1
emo e all st an rt th a clean ry cloth. h s ll ncrease the
on to the 1
s l cone.
tart th the ottom panel apply a enero s amo nt o 1
s l cone to the cement oar an to the ac s e o the all
panel. e er to the man act rer s recommen at ons or
appl cat on an ry n t me.
Br aces may be re uired to keep walls flush