Ambirad Vision VSXUS 90 Скачать руководство пользователя страница 32

32 

8.1 

To Start the Heater 

 

1. First ensure that the gas supply to each 

heater is turned on by opening the main 
gas shut off valve. 

 
2. Ensure that the setting of any time switch 

and thermostat are such that the heating 
system will be required to operate. 

 
3. Switch o the electricity supply to the 

heater. The fan will start, the ‘power on’ 
light on the burner will illuminate and     
ignition commence. 

 
4. Ignition will occur. 
 
5. If ignition is successful the gas valve will 

close and the spark ignition de-energize 
after  approximately  10  seconds.  For      
approximately 10 - 20 seconds the fan will 
purge the system then re-ignition will be 
attempted. After 3 attempts at ignition the 
control unit will ‘lock-out’, the ‘power on’ 

lamp will remain illuminated and the fan will 
continue to run. To reset after ‘lockout’, 
switch off the power supply to the heater 
and wait 5 minutes. Then turn the power on. 
If repeated ‘lockout’ occurs investigate the 
cause. 
 

 
 
8.2.  To Switch Off Heater 
 

1. Switch off electrical supply to the heater. 

The burner will stop and the fan will shut off. 
 
 
 

8.3. Servicing 
 

1. To ensure continued efficient and safe   

operation it is recommended that the heater 
be serviced regularly by a qualified person 
every year in normal working conditions but 
in exceptionally dusty or polluted conditions 
more frequent servicing may be needed. 

8.  User & Operating Instructions. 

Document re

feren

ce number

 US/V

S/1

9/0708 

AmbiRad is the manufacturer of a series of tubular infra-red heaters designed for overhead heating 
of industrial and commercial buildings. Individual heating units are suspended from the roof or 
mounted at an angle on the wall 

1. 

This appliance must only be installed by qualified craftsmen in accordance with 
the requirements of local and National Codes. 

 
2. 

This appliance must be grounded in accordance with the National Electrical 
Code ANSI/NFPA No.70 or Canadian Codes. 

 
3. 

Never rest anything, especially ladders against the heaters. 

Ambi-Rad Limited  P.O. Box 617 
Fishers, Indiana 46038 
Telephone  317-577-0337 
Facsimile  317-842-3989 
Website  

www.ambirad.com/us 

 

For the Distributor Nearest please call 

1-888-330-4878 

AmbiRad is a registered trademark of AmbiRad Limited. Because of continuous product 
innovation, AmbiRad reserves the right to change product specification without due notice. 

Your Local Representative 

Содержание Vision VSXUS 90

Страница 1: ...ions thoroughly before installing or servicing this equipment ASSEMBLY INSTALLATION SERVICING MANUAL FOR AMBIRAD VSXUS INFRA RED HEATERS INDEX Section Introduction and Document Index Installation Requ...

Страница 2: ...nt 7 2 Air Pressure Switch Replacement 7 3 Gas Valve Replacement 8 User and Operating Instructions 8 1 To Start Heater 8 2 To Switch Off Heater 8 3 Servicing and servicing is undertaken on radiant tub...

Страница 3: ...Couplings Connector must comply with ANSI Z21 24 CSA 6 10 Shipping packages for individual projects will be boxed and crated as outlined in the specific bill of lading 1 3 Heater Suspension Attachmen...

Страница 4: ...Drop rod with formed hook n b hook or eyebolt must be closed tight after installation Alternative method of suspending U tube and linier type heaters IMPORTANT THE HEATER SHOULD SLOPE DOWNWARDS TOWARD...

Страница 5: ...ented C2 20 20 Above Burner Heater Outlet Unvented C3 24 24 Behind Burner D1 32 42 Behind Burner with Vent connected D2 24 24 End Wall F 21 21 Table 2 Clearances to combustibles VSXUS C1 B E A C2 or C...

Страница 6: ...aking a gas connection to the heater not to apply excessive turning force to the internal controls Depending on the specific installation the flexible gas hose may be routed to the gas cock at any of...

Страница 7: ...10 heaters per thermostat for zone control of the heated area Control Panels are not A G A CSA design certified Where alternative m a n u f a c t u r e s controls are used please refer to their instr...

Страница 8: ...YELLOW If any of the original wire as supplied with the appliance must be replaced it must be replaced with wiring material having a temperature rating of at least 220 F 105 C Heater 1 Heater 2 Heater...

Страница 9: ...s Should condensation occur the vent should be shortened or insulated The terminal should be at least 3ft away from any air intake to the building If the heater is equipped with ducted combustion air...

Страница 10: ...th no flue the ventilation instructions detailed in section 1 8 must be applied Ducted air must be used in locations where there is airborne dust or where there is a polluted atmosphere e g Chlorinate...

Страница 11: ...heaters are installed with no flue the ventilation instructions detailed in section 1 8 must be applied Ducted air must be used in locations where there is airborne dust or where there is a polluted a...

Страница 12: ...he ventilation instructions detailed in section 1 8 must be applied Ducted air must be used in locations where there is airborne dust or where there is a polluted atmosphere e g Chlorinated Vapours Ma...

Страница 13: ...90 201687 3133 201676 12 2 Assembly Instructions PLEASE READ this section prior to assembly to familiarise yourself with the components and tools you require at the various stages of assembly Carefull...

Страница 14: ...End Caps Outer Canopy End Caps Tubes Turbulators Couplers 2x 2x 2x 2x 2x 2x 2x 3x 2x 2x Brackets 3x 4x M4 Full Nut 1x 2x Burner M6 Mudwasher M6 Washer M6 Full Nut M4 x 10 Pozi Setpin No 5 Torque Scre...

Страница 15: ...s shown in the assembly drawings section Slide brackets over tubes as shown 1 2 4 Step by step installation 2 4 1 TUBES TURBULATORS 2x 2x 3 D0 NOT tighten any of the nuts at this stage Locate and inse...

Страница 16: ...lectors supplied all have the same hole positions however each end reflector should be positioned with the holes for the end caps position arrowed outermost Starting at the burner end slide the reflec...

Страница 17: ...using end elongated holes in each 4x 4x 11 At this stage all the U bolts should be fully tightened Using M4 setpins washers fix the cut out end cap beneath the reflector profile at the burner end with...

Страница 18: ...er and heat exchanger be assembled once the heater has been installed in the roof space Locate 6 off No 5 torque screws Position the blank canopy end cap with the end cap flanges facing inwards beneat...

Страница 19: ...range of heaters Please note the heater type length and reference number from the delivery advice note before identifying the correct model drawing Figure 9 VSXUS Heater Assembly VSXUS140 19 5 REFERE...

Страница 20: ...20 Figure 10 VSXUS Heater Breakdown 3 module VSXUS140 shown...

Страница 21: ...a satisfactory pressure condition has been established the ignition sequence will commence The spark ignition will be energized producing a spark at the ignition electrode The gas solenoid valve will...

Страница 22: ...through its start up sequence and ignite Turn off power and check that all components are securely fastened Has the burner lit Check operation on flame failure Check gas pressure Check gas pressure C...

Страница 23: ...ver Leather Faced Gloves Spanner 4 1 Tools Required The following tools and equipment are advisable to complete the tasks laid out in this manual Suitable alternative tools may be used Large Adjustabl...

Страница 24: ...anger and remove the flexible hose from the burner Step 5 Slacken the set screw on the burner support casting to enable the burner to be removed from the radiant tube Step 6 Remove the burner and posi...

Страница 25: ...replaced ensuring the 5 holes on the outer ring are aligned alongside the probes Step 3 The condition of the igniter assembly can be checked for deterioration However we advise replacement at each se...

Страница 26: ...brush Step 6 Remove any dust from fan scroll and from around the motor Step 7 Ensure the impeller rotates freely Step 8 Refit components 4 7 Radiant Tube Servicing Step 1 Brush any dust from the exter...

Страница 27: ...vicing The condition of the reflectors should be noted If necessary the reflectors can be cleaned with a mild detergent This can significantly improve the efficiency of the appliance 4 10 Sweeping of...

Страница 28: ...rt No Description See section 1 11 Injector 200358 Burner Tube Item 201284 Ignitor Assembly Part No Description 200988 Pepperpot Head Item 201508 201697 201676 Pressure Switch VPLUS40 VPLUS200 Others...

Страница 29: ...uum switch pull in Check 1 Wiring harness plugs 2 Vacuum switch operation 3 Replace fan Is the burner sparking Does the gas valve open Check 1 Ignition controller 2 Replace gas valve Check 1 Vacuum sw...

Страница 30: ...Fit new burner controller Step 6 Refit leads Step 7 Test product and close access door 7 2 Air Pressure Switch Replacement Step 1 Open left hand door Disconnect the two silicone impulse tubes Step 2 R...

Страница 31: ...r head can now be detached by disconnecting the impulse tube and the burner head wiring Step 6 Detach the two screws holding the front of the gas valve Step 7 Remove the four screws holding the rear b...

Страница 32: ...vicing 1 To ensure continued efficient and safe operation it is recommended that the heater be serviced regularly by a qualified person every year in normal working conditions but in exceptionally dus...

Отзывы: