
2
Introduction.
Document Index.
1 Installation Requirements
1.1 Health & Safety
1.2 Packing and Shipping Information
1.3 Heater Suspension
1.4 Wall Mounting
1.5 Clearance to Combustibles
1.6 Gas Connection & Supply Details
1.7 Electrical Connections
1.8 Ventilation Requirements
1.8.1 Unflued Units
1.8.2 Vertical Venting
1.8.3 Horizontal Venting
1.8.4 Fresh Air Intake
1.9 Flue & Combustion Air Inlet
1.10 Technical Details
2 Assembly Instructions
2.1 Tools Required
2.2 Identification Check List
2.3 Prior to Assembly
2.4 Assembly Instructions
2.4.1 Turbulators
2.4.2 Brackets, U bolts and U bend
2.4.3 Reflectors
2.4.4 End Caps
2.4.5 Canopies
2.4.6 Canopy End Caps
2.4.7 General
2.4.8 Detailed Assembly Drawings
3 Start Up Instructions
3.1 Tools Required
3.2 Start up procedure
4 Servicing Instructions
4.1 Tools Required
4.2 Burner Description
4.3 Burner Removal
4.4 Burner Gas Injector Servicing
4.5 Burner Head and Electrode Servicing
4.6 Combustion Fan Assembly
4.7 Radiant Tube Servicing
4.8 Heat Exchanger Servicing
4.9 Reflector Servicing
4.10 Sweeping of Flue
4.11 Re-commissioning after Service
5 Spare Parts
6 Troubleshooting Guide
7 Replacing Parts
7.1 Burner Controller Replacement
7.2 Air Pressure Switch Replacement
7.3 Gas Valve Replacement
8 User and Operating Instructions
8.1 To Start Heater
8.2 To Switch Off Heater
8.3 Servicing
and servicing is undertaken on radiant tube
heaters specified in these instructions, due care
and attention is required to ensure that working
at height regulations are adhered to at the
mounting heights specified.
PLEASE READ this document prior to
installation to familiarize yourself with the
components and tools you require at the various
stages of assembly.
All Dimensions shown are in inches unless
otherwise stated.
The manufacturer reserves the right to alter
specifications without prior notice.
Welcome to the new range of high efficiency
AmbiRad VSXUS infra-red heaters. Local
regulations may vary and it is the installer’s
responsibility to ensure that such regulations
are satisfied.
All installation, assembly, commissioning and
service procedures must be carried out by
suitable qualified competent persons and
conform with local building codes, or in the
absence of local codes, with the National Fuel
Gas Code ANSI Z223.1/NFPA 54 or the
National Gas and Propane Installation Code
CSA B149.1
When assembling, installing, commissioning
Improper installation, adjustment,
alteration, service or maintenance
can cause property damage, injury or
death. Read the instructions thoroughly
before
installing
of
servicing
this
equipment.