Ambirad Vision VSO Series Скачать руководство пользователя страница 12

Doc No. 700021  Page 12 of 20 

*CAN

OP

Y FI

XI

NG

F

O

U

R

 M

O

DU

LE

 O

N

LY

POSI

TI

ON

 E

FOUR

MODULE

THREE

MODULE

SC

R

AP PL

AN

 VIE

W

FR

OM AB

OVE 

H

E

A

T

ER

30

mm OVERL

A

P

30

mm OVERL

A

P

30

mm

 O

V

E

R

L

A

P

90

mm OVERL

A

P

30

m

m

 O

V

ERL

A

P

30m

m OVE

R

LA

P

55m

m

35m

m

E

SC

R

AP PL

AN

 VIE

W

FR

OM AB

OVE 

H

E

AT

ER

S

C

RA

P PL

AN

 V

IE

W

FR

OM ABOVE

 H

E

A

T

E

R

FOURTH

CA

N

O

P

Y

TH

IR

D

CA

NOPY

CA

NOP

Y

 FIXING

D

E

TAI

L

 (E

XC

EP

*)

15m

m

15

m

m

SC

RA

P VIE

W

S

 F

R

OM 

A

BO

VE

TWO

MODULE

Fig. 4  Canopy detail 

Содержание Vision VSO Series

Страница 1: ...1974 or relevant codes of practice In addition the installation must be carried out in accordance with the current IEE wiring regulations BS 7671 BS 6896 Industrial Commercial and any other relevant...

Страница 2: ...th and Safety AmbiRad heaters must be installed in accordance with the relevant provisions of the Gas Safety Installations and Use Regulations 1998 Due account should also be taken of any obligations...

Страница 3: ...ollowing tools and equipment are advisable to complete the tasks laid out in this manual Suitable alternative tools may be used 2 2 Assembly Notes refer fig s 1 7 2 2 1 Tubes Identify and position tub...

Страница 4: ...he heater have been fully assembled and hung in position see Final Fixings section 2 2 7 2 3 All remaining U bolts on the RETURN TUBE should also be tightened to achieve a minimum torque setting of 15...

Страница 5: ...A A A A A TWO MODULE THREE MODULE FOUR MODULE 3400mm TUBE 3400mm TUBE 3400mm TURBULATOR 976mm TURBULATOR 2600mm TURBULATOR 976mm TURBULATOR 3040mm TURBULATOR 976mm TURBULATOR 2600mm TURBULATOR 3400mm...

Страница 6: ...7 1 Overshield Reflectors Overshields J1 are fitted to the underside of and run in parallel to the inner reflectors One end of the overshield has two holes for direct fixing to the reflector the other...

Страница 7: ...IELD 201928 1680 OVERSHIELD 201928 1680 OVERSHIELD 201931 1200 OVERSHIELD 201931 1200 OVERSHIELD BURNER END BURNER END BURNER END AV NUT WASHER CROSS MEMBER OVERSHIELD REFLECTOR WASHER SET PIN EXPANSI...

Страница 8: ...second reflector onto the same bolt using the FIRST slot in from the end and OVERLAP the first reflector This should create a 77mm overlap Secure using large washers and anti vibration nuts 5 The slot...

Страница 9: ...9 Locate the fourth reflector onto the same bolts using the FIRST slot in from the end and OVERLAP the third reflector This should create a 84mm overlap Secure using large washers and anti vibration...

Страница 10: ...21 Page 10 of 20 TWO MODULE THREE MODULE FOUR MODULE 114mm OVERLAP 67mm OVERLAP 77mm OVERLAP 84mm OVERLAP 77mm OVERLAP 50mm OVERLAP WASHER REFLECTOR WASHER REFLECTOR FIXING DETAIL D AV NUT Fig 3 Refle...

Страница 11: ...which holds the two halves together Install the outer canopies using the following method 2 2 8 1 Two Module Units 1 Slide on the two halves to cover the 1st section of the heaters and fit closing pla...

Страница 12: ...AN VIEW FROM ABOVE HEATER 30mm OVERLAP 30mm OVERLAP 30mm OVERLAP 90mm OVERLAP 30mm OVERLAP 30mm OVERLAP 55mm 35mm E SCRAP PLAN VIEW FROM ABOVE HEATER SCRAP PLAN VIEW FROM ABOVE HEATER FOURTH CANOPY TH...

Страница 13: ...ly On VSXO only slide the heat exchanger assembly E1 onto the LEFT HAND TUBE when viewed from behind ensuring it is fully engaged Secure with pinch screws 2 2 13 Fan Assembly On unitary heaters only s...

Страница 14: ...e end of the fitting and internally round the end of the tube Enter the fitting into the tube using a slight rotating movement to spread the jointing compound uniformly until a penetration of 75mm 3in...

Страница 15: ...J2 Expansion Plate J3 Cross Member K Insulation L Outer Canopy M Canopy End Cap N Closing Plates P End Mouldings optional Ref Description A Radiant Tubes B Suspension Brackets C Return Bend D Coupler...

Страница 16: ...nitary heaters E3 Damper Herringbone F1 Forced Burner VSXO F2 Induced Burner VSO G Turbulators Fig 6 Three Module drawings A B C G P J1 J2 D H J3 K L M N F1 F2 E1 E2 E3 H Reflectors J1 Overshields J2...

Страница 17: ...unitary heaters E3 Damper Herringbone F1 Forced Burner VSXO F2 Induced Burner VSO G Turbulators H Reflectors J1 Overshields J2 Expansion Plate J3 Cross Member K Insulation L Outer Canopy M Canopy End...

Страница 18: ...Doc No 700021 Page 18 of 20 Notes...

Страница 19: ...Doc No 700021 Page 19 of 20 Notes...

Страница 20: ...cleaning of the reflectors with a soft cloth and a mild detergent non solvent based cleaners only in water can be undertaken Additional removal of dust from the radiant tubes burner and heat exchange...

Отзывы: