Copyright 2018 by Amber Kinetics. All rights reserved.
16
M32 FLYWHEEL - INSTALLATION & MAINTENANCE MANUAL
3.1 - Planning
When planning a multi-M32 flywheel installation:
•
The total DC capacity will be 8kw times the number
of M32 flywheels in the installation.
•
Each block of M32 flywheels consists of two rows.
•
Figure 3 displays the minimum clearance
requirements between individual M32 flywheels,
blocks, and the site perimeter.
Figure 3: Clearance requirements at a multi-M32 flywheel site
Содержание M32
Страница 1: ...M32 FLYWHEEL INSTALLATION MAINTENANCE MANUAL v2 0 March 2018 ...
Страница 41: ...37 Copyright 2018 by Amber Kinetics All rights reserved 5 MAINTENANCE This page intentionally left blank ...
Страница 42: ...M32 FLYWHEEL INSTALLATION MAINTENANCE MANUAL v2 0 March 2018 2018 Amber Kinetcs Inc All rights reserved ...