
8. Take the metering roller
1
out of the roller cage
2
.
9.
For uniform concentricity,
align the direction of rotation of the desired
metering roller with the mark
3
.
Metering
wheel
Colour
Applicatio
ns
Spread
rate
Metering
wheel 4
cm
3
Orange
Insecticide
5-20 kg/ha
Metering
wheel 3
cm
3
Silver grey Slug pellets 2-10 kg/ha
Metering
wheel 12
cm
3
Green
Micro-
fertiliser
10-35 kg/ha
10. Insert the desired metering roller into the roller
cage.
CMS-I-00002583
11. Insert the roller cage
1
along with the metering
roller into the metering housing.
CMS-I-00002584
12. Insert the drive unit
1
into the metering roller.
13. Rotate the drive unit clockwise.
14. Close the metering unit cover.
The locking mechanism engages.
15. Set the sliding shutter to the top position.
CMS-I-00002585
6 | Preparing the machine
Preparing the implement for operation
MG6967-EN-II | C.1 | 27.09.2021
73
Содержание Precea 6000-2
Страница 36: ...CMS I 00004142 CMS I 00003965 4 Product description Warning symbols MG6967 EN II C 1 27 09 2021 30...
Страница 252: ......
Страница 253: ......