![Amazone Precea 6000-2 Скачать руководство пользователя страница 75](http://html1.mh-extra.com/html/amazone/precea-6000-2/precea-6000-2_original-operating-manual_2919775075.webp)
4. Actuate and hold the control lever
1
.
5. Push the filling auger
2
into the desired
position.
6. Release the control lever.
The filling auger is locked in the desired position.
CMS-I-00003949
7. Open the cover tarpaulin
1
of the filling funnel.
8. Swivel out the filling chute
2
.
9. Remove residues or foreign objects from the
filling funnel.
NOTE
The maximum filling capacity is reached when a
material cone is formed over the feed auger. If
possible, let the fertiliser run directly into the filling
funnel.
10. Switch on the "beige 1" tractor control unit at 32
litres/minute.
2
1
CMS-I-00001894
11. Slowly switch on the filling auger's drive on the
ball valve
1
.
The fill level in the fertiliser hopper rises.
NOTE
Determine the payload of the implement and
axles loads of the tractor.
12. Monitor the fill level through the inspection
window.
13.
When the fill level rises beyond the edge of the
inspection window,
reduce the filling auger speed with the ball valve
2
.
14.
When the fertiliser hopper is full,
slowly switch off the filling auger with the ball
valve
2
.
1
2
CMS-I-00001895
6 | Preparing the machine
Preparing the implement for operation
MG6967-EN-II | C.1 | 27.09.2021
69
Содержание Precea 6000-2
Страница 36: ...CMS I 00004142 CMS I 00003965 4 Product description Warning symbols MG6967 EN II C 1 27 09 2021 30...
Страница 252: ......
Страница 253: ......