
On receipt of the machine
21
DB 534 02. 02
-
Pull off protective half.
ZA 015a
I
Before fitting the PTO shaft clean and
grease the gearbox input shaft
-
Slacken greasing nipple (1)
-
Apply PTO shaft (2).
-
Affix connecting yoke (3) with shear bolt (4).
-
Screw in grease nipple (1).
ZA 016a
Assembly of PTO shaft guard:
-
Push on guard half (1).
-
Twist guard cone (2) into fitting position.
-
Screw in locking bolt (3).
-
Tilt machine to the front.
-
Apply second PTO shaft half and affix in the
upper link bracket.
-
Secure the guard tube on the frame by using a
chain.
1
2
1
3
4
2
3
1
Содержание E+S
Страница 39: ...Setting charts 39 DB 534 02 02 9 2 Thawing salt...
Страница 40: ...40 Setting charts DB 534 02 02 9 3 Moraine grit...
Страница 41: ...Setting charts 41 DB 534 02 02 9 4 Slag...
Страница 42: ...42 DB 534 02 02...
Страница 43: ...43 DB 534 02 02...