
5 Installation at Site
35 of 124
Amarex KRT
Table 20:
List of components
Part No.
Description
Part No.
Description
571
Bail
901.26
Hexagon head bolt
59-17
885
Fig. 23:
Chain attached to the eyebolt with a shackle
Table 21:
List of components
Part No.
Description
Part No.
Description
59-17
Shackle
885
Chain
5.3.2.2 Installing the pump set
NOTE
If foundation rails 89-8 are included in KSB's scope of supply, they must be set in
concrete as shown in the general arrangement drawing/outline drawing.
5.3.2.2.1 Installing the pump set with integrally cast pump feet
901.01
920.18
550.07
139
901.16
550.16
89-8
Fig. 24:
Installing the pump set with pump feet
1. Fasten suction elbow 139 to the suction nozzle with hexagon head bolts 901.01,
discs 550.07 and nuts 920.18.
2. Place the pump set in a vertical position. Attach lifting equipment to the
attachment point provided (eyebolt).
3. Place the pump set on the foundation.
Make sure the pump casing is evenly seated; use shims if necessary.
4. Fasten the integrally cast pump feet of the pump set to foundation rails 89-8
with hexagon head bolts 901.16 and discs 550.16.
Содержание KRT series
Страница 120: ...Index 120 of 124 Amarex KRT W Warnings 7...
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2553 8051 04 EN US 01463269...