manualshive.com logo in svg
background image

15

Scheduled Maintenance

Daily

Weekly

Monthly

Every 6 

Months

Annually

Empty and rinse the recovery tank

Check the vacuum motor filter

Check for loose or lost fasteners

Inspect hoses and connections

Inspect pad holder / brush

Check the squeegee blades

Check the suction hoses and squeegee

Inspect battery water level (Lead Acid only)

Thoroughly clean the recovery tank

Check the solution tank filter

Check wiring for fray or cut

Check the scrub deck linkage

Check the squeegee linkage and cable

Inspect drive belt

Replace drive belt

Check safety systems

Check the carbon brushes of motors

Check the electrical system

Check the brake system

Interval

As Required

These items must be performed with the proper tools and training.  Contact an Amano Pioneer Eclipse 

Factory Certified Technician unless you have the proper equipment and mechanical proficiency.

Operation

Vacuum Motor Maintenance

The vacuum motor must be checked and cleaned. The 

carbon brushes should be checked every six months 

and replaced if necessary. To check the vacuum 

motor, remove the key from the main key switch and 

disconnect the battery cable from the machine. At the 

rear of the control panel, loosen the single screw (1) on 

the bottom of the control panel. Raise the control panel 

up, giving access to the vacuum motor.
Unhook the retaining strap (2) and disconnect the 

cable plug (3) going to the motor. The motor can now 

be removed for service and cleaning. While the motor 

is removed, also thoroughly clean this area and the 

foam filters (4) above and behind the motor. Replace if 

necessary.
Remove, check, and clean the gasket (5) on the front of 

the motor. Visually check the motor fan for damage and 

make sure it is clean. Check the carbon brushes (6) by 

removing the plastic cap and then remove the screws 

that hold the plastic housings. If they are severely worn 

or damaged, replace if necessary.

6

2

3

1

5

4

4

Содержание PE310AS

Страница 1: ...Walk Behind Autoscrubber PE310AS Operator s Manual...

Страница 2: ......

Страница 3: ...rvice should include an emissions check Instructions For Use Failure to read and understand this manual before operating this machine or performing service on this machine may result in injury to the...

Страница 4: ...ored Read and observe all WARNING statements included in the Operation Manual and attached to the machine CAUTION indicates that the possibility of damage to the machine or other property can occur if...

Страница 5: ...ose 11 Pad Brush Pedal 11 Solution Adjustment Lever 11 Solution Tank Drain Hose 11 Solution Tank Fill 11 Recovery Tank Access 11 How the Machine Works 12 Battery Charging 12 Preparing the Machine 12 F...

Страница 6: ...50 kg Battery Compartment Size LxWxH 12 2 x 13 8 x 10 2 310mm x 350mm x 260 mm Voltage 24 VDC Power Source 12 VDC 110Ah Battery Qty 2 Pad Drive Gearmotor 370W 17A Traction Motor 110W 8A Vacuum Motor 5...

Страница 7: ...s in operation and for a long time after the machine is shut off to cause severe burns DO NOT touch these parts of the machine until they have cooled WARNING Injury can occur to the eyes and body whil...

Страница 8: ...cts of signboards buildings or hillsides for at least 15m 50ft from the center of the test surface Indoor tests are conducted in a semi anechoic or sound deadening room The test surface is a single sh...

Страница 9: ...amage to these components Secure the machine to the transporting vehicle so that it does not move during transport Always engage the parking brake while the machine is being transported For a longer t...

Страница 10: ...nt Lever Pad Brush Lift Pedal Squeegee Lift Lever Recovery Tank Clean Out Solution Tank Drain Hose Recovery Tank Drain Hose Main Key Switch Battery Level Indicator Vacuum Switch Pad Motor Switch Parki...

Страница 11: ...wer the squeegee pick up on the lever and rotate it towards the right side of the machine Allow the lever to fall and the squeegee will rest on the floor When you need to lift the squeegee pick up on...

Страница 12: ...attery charger plug from the battery connector Then connect the battery connector plug to the machine plug Close the battery cover Turn on the main key switch to operate the machine Filling Solution T...

Страница 13: ...able The machine has three pad pressure settings 44 lbs 20 kg 66 lbs 30 kg 88 lbs 40 kg To adjust the pad pressure lower the pad drive assembly to the floor and remove the splash skirt Using the tab o...

Страница 14: ...the number of charges the batteries receive To get the most life from the batteries charge them when the battery indicator light is red Use only the supplied battery charger to charge the batteries Pe...

Страница 15: ...hanical proficiency Operation Vacuum Motor Maintenance The vacuum motor must be checked and cleaned The carbon brushes should be checked every six months and replaced if necessary To check the vacuum...

Страница 16: ...ck valve and linkage Air leak Check recovery tank access lid drain hose plug recovery tank clean out Worn squeegee blades Rotate or replace squeegee blades Squeegee out of adjustment Adjust squeegee V...

Страница 17: ...____ ________________________________________________ ________________________________________________ ________________________________________________ ________________________________________________...

Страница 18: ...Electrical Schematic 18...

Страница 19: ...TIVE 1 17 PY614 CABLE BATTERY POSITIVE 1 18A MP276600 BATTERY 12V SCS150 TROJAN 2 18B MP382500 BATTERY 12V SEALED 100AH 2 Item Ref No Description Qty 19 PY001 CABLE BATTERY 1 20 PY350 TERMINAL 4 POLE...

Страница 20: ...Tanks Cover Assembly 20...

Страница 21: ...LASH 1 45 DD452 NUT LOCK M5 2 46 RO455 WASHER LOCK M8 2 47 VC410 SCREW M5 X 12 1 Item Ref No Description Qty 48 RO500 WASHER FLAT M5 1 49 RO502 WASHER FLAT M8 X 24 1 50 VC402 SCREW M4 X 10 2 51 GR141...

Страница 22: ...Pad Drive Assembly 22...

Страница 23: ...SHING RUBBER 1 20 TB207 HOSE DELIVERY SOLUTION 1 21 SU426 BRACKET MOUNT MOTOR 1 22 DT161 SPACER FLANGE 1 Item Ref No Description Qty 23 CH048 KEY STRAIGHT M6 1 24 FL071 FLANGE DRIVE MOTOR 1 25 VI020 W...

Страница 24: ...Drive Wheel Assembly 24...

Страница 25: ...3 NUT HEX M5 6 25 LM433 BRACKET SPLASH LEFT 1 26 BO082 BUSHING BRASS M5 1 27 MO205 MOTOR 100W 750RPM 24V 1 28 RO403 WASHER FLAT M6 2 Item Ref No Description Qty 29 BO082 BUSHING BRASS M5 1 30 PP024 PU...

Страница 26: ...Squeegee Assembly 26...

Страница 27: ...SCK HD M8 X 16 2 33 RO455 WASHER LOCK M8 2 34 PT228 BRACKET MOUNT SQUEEGEE 1 35 GH006 NUT JAM ADJUSTMENT SQ 1 36 VI007 SCREW ADJUSTMENT SQ 1 Item Ref No Description Qty 37 RC113 FITTING ELBOW HOSE 1 3...

Страница 28: ...Handle Assembly 28...

Страница 29: ...SWITCH FLOAT 1 37 VS423 SCREW C SINK M6 X 16 1 38 RO911 WASHER WAVE M8 1 Item Ref No Description Qty 39 LV293 LEVER SOLUTION 1 40 VP055 GRIP LEVER M4 X 20 1 41 DD453 NUT LOCK M6 1 42 SU430 BRACKET PLU...

Страница 30: ......

Страница 31: ......

Страница 32: ...5 l USA www pioneereclipse com 1 336 372 8080 1 800 367 3550 Fax 1 336 372 2913 2022 Amano Pioneer Eclipse Corporation LT071400 310AS_C 040422 EC Machinery Directive 2006 42 EC EC Restriction of Hazar...

Отзывы: