16
CALIBRATION OF TI-PREFORMS BLANK HOLDER
E N
2.4.4 Performing the final calibration milling
▷
Start the hybrid milling machine software on the
PC.
▷
Switch to calibration folder by clicking on the
Calibration button.
Several program files are listed:
Fig. 6
List of program files
MM
Measuring result in mm
FN
File name end (M3-Holder 4-Calibration...)
▷
Select the program, whose last 4 file name dig-
its correspond with the noted down measuring
value in step 1. e.g.:
▪
Determined measuring value MM: 31.89 mm
▪
FN calibration file to be selected:
M3-Holder 4-Calibration_31.89
▷
Transfer the respective program to the hybrid
milling machine.
▷
Ensure that the machine is set up according to
the necessary specifications of the program
window and confirm with
OK.
The milling data are transferred.
MM
FN
MM
FN
MM
FN
MM
FN
MM
FN
32.12
..._32.12
32.07
..._32.07
32.02
..._32.02
31.97
..._31.98
31.92
..._31.92
32.11
..._32.11
32.06
..._32.06
32.01
..._32.01
31.96
..._31.96
31.91
..._31.91
32.10
..._32.10
32.05
..._32.05
32.00
..._32.00
31.95
..._31.95
31.90
..._31.90
32.09
..._32.09
32.04
..._32.04
31.99
..._31.99
31.94
..._31.94
31.89
..._31.89
32.08
..._32.08
32.03
..._32.03
31.98
..._31.99
31.93
..._31.93
31.88
..._31.88
Tab. 1
Program file – Allocation of measuring result