19
Installer selects right or left
side drain
and
installs this hose accor
dingly.
Ho
se #1
Ho
se #2
45 de
gree
barb-pipe
adapte
r
45 de
gree
barb-pipe
adapte
r
Figure 26
Drain Exiting Left Side
1. Install the 45 degree pipe / hose drain coupling from
the outside of the cabinet (barbed end goes in the
cabinet) through the hole in the left side of the cabinet
and secure with two field supplied #8 self-tapping
screws (see Figure 26).
2. Locate the long drain hose #3 and cut at “B” line for a
17.5” cabinet; cut at line “C” for a 21” cabinet; do not
cut for a “D” width cabinet.
3. Install large end of hose #3 to trap outlet and secure
with 1.25” clamp.
4. Install smaller end of hose #3 on 45º elbow and
secure with 1” clamp.
5. Refer to Field Supplied Drain section for instructions
on field supplied / installed drain on outlet of furnace
trap.
Upflow Model Installed Horizontally
with Right Side Down (See Figure 27)
Minimum 5
½
” clearance is required for the drain trap
beneath the furnace.
1. Remove the clamps from both ends of the drain
hoses.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and two hoses from the blower deck.
4. Remove the two plugs from the right side of the
cabinet and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #2 (factory
installed) and cut 1” away from the 45 degree bend,
discard the 45 degree section. Insert hose #2 from
outside the cabinet through the cabinet drain hole
nearest the top. Secure it to the barbed fitting in the
elbow with a red clamp.
6. For models DM96VE0303AN, DM96VE0403AN
and DM96VE0603AN; locate the hose #2 (factory
installed) and cut 1.5” length from the end of the hose.
Insert hose #2 from outside the cabinet through the
cabinet drain’s hole nearest to the top. Secure it to the
barbed fitting in the elbow with a red clamp.
7. (Draining the Collector Box) Install the non-grommet
end of hose #11 from outside the cabinet in the
bottom drain hole. Install on collector box and secure
with a silver clamp.
8. Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws
removed in step 2 by inserting the two screws through
the large set of holes in the top mounting tabs of the
trap into the two predrilled holes in the side of the
cabinet.
9. Refer to Field Supplied Drain section for instructions
on field supplied / installed drain on outlet of furnace
trap.
Ho
se #11
Ho
se #2
Figure 27
Upflow Model Installed Horizontally with Left
Side Down (See Figure 28)
Minimum 5
½
” clearance is required for the drain trap
beneath the furnace.
*Also see Front Cover Pressure Switch Tube Location on
page 11.
1. Remove the clamps from the two drain tubes on the
trap.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and hoses from the blower deck.
4. Remove the two plugs from the left side of the cabinet
and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #6. Measuring
from the non-grommet end; cut off and discard 1 ½”
for a “D” width cabinet, 5” for a “C” width cabinet, 8 ½”
for a “B” width cabinet.
6. Remove the rubber plug from vent – drain elbow side
port. Place hose #6 on the vent – drain elbow side
port and secure with a silver clamp.
Содержание *MEC96
Страница 59: ...59 THIS PAGE IS LEFT INTENTIONALLY BLANK ...