software updates have been installed. Review
notes for optional software updates and install if
necessary.
NOTE: If an E11 code exists for the inverter system
immediately after line voltage is applied (code shown in the
CoolCloud HVAC phone application or displayed on the
inverter control), the System Verification Test needs to be
completed before any other operation. See the following
procedure.
1. Allow the system to remain Idle for 5 minutes.
2.
Turn the system verification test on either by using
the phone application, or by entering the
SUt
menu
through the furnace push buttons.
3. Wait for the test to complete.
Charging
1. Inverter units using the
CoolCloud
HVAC phone
application or control board push button:
a. Inverter units are charged by setting
the CR9 menu (Charge Mode) to ON through
the furnace control board push buttons
or through the
CoolCloud
HVAC phone
application.
b. The System will remain in charge mode (high
speed) for 60 minutes before timing out.
c.
The installer must manually shut off charge
mode once complete.
2. Two-stage outdoor units using the
CoolCloud
HVAC
application:
a.
Using the cooling icon after entering the outdoor
unit menus, energize the outdoor unit at 100%
capacity.
b. Charge the outdoor unit as required using the
charging information provided with the outdoor
equipment.
Gas Furnace Testing
1. Two-stage Operation using the
CoolCloud
HVAC
application:
a. Select the gas heat icon after entering the
furnace menus.
b. Select any value less than 50% for low stage
operation and any value greater than 50% for
high stage operation.
4. Confirm thermostat heating and cooling calls function
proprly with equipment.
Quick Start Guiide For Non-Communicating
Outdoor Units
When setting up a ComfortBridge™ furnace for use
with a Non-Communicating outdoor unit you must
set airflow in the “ton” menu on the PCB or in the
CoolCloud HVAC APP. Failure to do so will result in
the furnace PCB displaying “
IdL
” and the blower will
not operate with a call for cooling. The Board does not
need to be replaced, you MUST set the airflow first.
instructed by the applicable wiring diagrams shown in
this section.
2. Connect the 1 & 2 wires between the indoor and
outdoor unit for communicating operation.
Note: verify two stage outdoor units include a 24 VAC
transformer (for outdoor control board power) Two
stage outdoor units may not behave properly without
this 24 VAC transformer.
R
C
G
Y
Optional
Optional
Optional if
feature
supported by
thermostat
INDOOR
BOARD TERMINAL
CONNECTIONS
OUTDOOR
BOARD TERMINAL
CONNECTIONS
OUTDOOR
TRANSFORMER
1
2
C
R
C
G
Y
1
2
C
Communicating Two Stage Air Conditioner or Heat
Pump
Figure 49
1
2
C
R
C
G
Y
Optional
Optional
Optional
INDOOR
BOARD TERMINAL
CONNECTIONS
OUTDOOR
BOARD TERMINAL
CONNECTIONS
1
2
C
R
C
G
Y
24 VAC
Thermostat
Communicating Inverter Air Conditioner or Heat
Pump
Figure 50
3.
Download the
CoolCloud
HVAC phone application for
charging and to configure/test system operations.
NOTE: When new versions of Bluetooth
Communication Software and Furnace Control
Software are available, the phone application
notifies the user. Software updates are classified
as either optional or mandatory and installed by
using the phone application. Ensure all mandatory
Содержание CVC96 BB Series
Страница 51: ...51 THIS PAGE IS INTENTIONALLY LEFT BLANK...