19
Vent & Combustion Air Intake Measurements for
Standard Horizontal Terminations (Dual Pipe)
Center to center = 10” min / 24” max.
Vertical separation: 0” - 24”
Vent termination from wall = 8” min / 12” max.
Combustion air intake from wall = 6” max.
Vent and intake clearance to ground or anticipated snow
level = 12” min.
3” MIN
12” MIN TO GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL
3”MIN
24”MAX
12” MIN SEPARATION
Termination of Multiple Direct Vent Furnaces
Figure 20
VENT/INTAKE TERMINATIONS FOR
INSTALLATION OF MULTIPLE DIRECT VENT
FURNACES
If more than one direct vent furnace is to be installed
vertically through a common roof top, maintain the same
minimum clearances between the exhaust vent and air
intake terminations of adjacent units as with the exhaust
vent and air intake terminations of a single unit.
If more than one direct vent furnace is to be installed
horizontally through a common side wall, maintain the
clearances as in the Figure 20. Always terminate all
exhaust vent outlets at the same elevation and always
terminate all air intakes at the same elevation.
Ve rtica l Installation
H orizontal Installation
Side Wall Vent Kit
Figure 21
Concentric Vent Termination
Refer to the directions provided with the Concentric Vent Kit or
IO-619 for installation specifications.
90º OR 45°
ELBOW
12" MIN. TO GRADE OR
HIGHEST ANTICIPATED
SNOW LEVEL
6” MAX
10”- 24”
4” MIN
Standard Horizontal Terminations (Dual Pipe)
Figure 17
90°
ELBOWS
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
3” - 24”
Alternate Horizontal Vent Termination (Dual Pipe)
Figure 18
90°
ELBOWS
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
3”-24” BETWEEN PIPES
Combustion Air Intake may also be snorkeled
to obtain 12” min ground clearance.
Alternate Vent Termination Above Anticipated Snow
Level
(Dual Pipe)
Figure 19
Содержание C9S96 Series
Страница 66: ...66 THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 67: ...67 THIS PAGE LEFT INTENTIONALLY BLANK...