background image

14

In some cases, a shorter extension above the roof may be
possible with a liner than would be required with a masonry
chimney.

For further information on relining, see Fix 4.

F

IX

 2 -C

HANGE

 

VENTING

 

ARRANGEMENTS

If the masonry chimney has more than one channel, it may be
possible to vent the gas appliances into one channel and vent
the solid or liquid fuel appliance(s) into another channel(s). Do
not vent an 80+ Furnace inside of a metal liner with other
appliances vented outside the liner.

Alternatively, the homeowner may agree to discontinue use of
the fireplace (solid fuel appliance). If so, the tile liner must be
cleaned to remove creosote buildup. The fireplace opening must
then be permanently sealed.

If oil-fired appliance(s) are being replaced by gas-fired
appliance(s), the tile liner must first be cleaned to remove the
fuel oil residue.

If none of the above options is practical, the furnace may need to
be vented vertically with a B Vent.

Under some conditions, Furnace *9 could be installed rather
than an *8. The * 9 can be vented horizontally or vertically through
PVC pipe.

F

IX

 3 - R

EBUILD

 

THE

 

CROWN

If the chimney crown is damaged, a qualified mason must repair
it in accordance with nationally recognized building codes or
standards. One such standard which may be referenced is the
Standard for Chimneys, Fireplaces, Vents, and Solid Fuel Burning
Appliances, ANSI/NFPA 211.

F

IX

 4 - R

ELINING

Relining options include B vent and flexible liners.

If the chimney has diagonal offsets, B vent probably cannot be
used.

If  B vent is to be used, it must be supported adequately. Supports
(such as fire stops or thimbles) must be used to prevent the B
vent from coming into direct contact with the tile liner or chimney
walls. Direct contact would result in higher heat loss, with an
increased possibility of poor venting system performance.

It is not acceptable to vent one appliance inside the B vent and
other appliances outside. The excess space between the B vent
and the chimney walls must be covered at the top of the chimney
by a weatherproof, corrosion resistant flashing.

The B vent should then be topped with a listed vent cap. The
listed vent cap will, when installed per the manufacturer’s
instructions, prevent problems due to rain, birds, or wind effects.

A B-vent installed as described in this section is considered to
be an enclosed vent system, and the sizing tables in National
Fuel Gas Code NFPA 54/ANSI Z223.1 - latest edition and in the
National Standard of Canada, CAN/CSA B149.1 and CAN/CSA
B149.2 - latest editions and amendments may be used.

If a flexible liner is to be used, it must be made of the proper
materials:

• For most residential applications, an aluminum liner

should be acceptable.

• If the combustion air supplied to the furnace will be

contaminated with compounds containing chlorine or
fluorine, a liner of AL294C stainless steel should be used.

If a metal liner is not present, a clay tile liner must be present, or
the chimney must be lined (Fix 4).

Use a flashlight and small mirror at the cleanout or vent connector
to inspect the clay tile liner. If any of the following problems are
present:

• Tile sections misaligned

• Tile sections missing

• Gaps between tile sections

• Signs of condensate drainage at the cleanout or vent

connectors

• Mortar protruding from between tile sections

• Use of sewer pipe or drainage pipe rather than an

approved fire clay tile reline the chimney (Fix 4).

Next, measure the size of the liner. It may be possible to do this
from the cleanout. The liner must be at least as large as the
minimum size established by the tables in National Fuel Gas
Code NFPA 54/ANSI Z223.1 - latest edition and in the National
Standard of Canada, CAN/CSA B149.1 and CAN/CSA B149.2 -
latest editions and amendments. If the liner is too small or too
large, then the chimney must be relined (Fix 4).

C

HECK

 6 - D

ILUTION

 A

IR

.

If gas-fired appliances are to be vented into a clay tile liner, a
source of dilution air is required.

Dilution air cannot be obtained through:

• Induced draft appliances

• Natural draft appliances with vent dampers

Sufficient dilution air can ordinarily be obtained through the draft
hood of a natural draft appliance only if the appliance’s vent
connector does not include a vent damper.  If dilution air will not
be available, the chimney must be relined (Fix 4).

C

HECK

 7 - C

OMPLETE

 

THE

 I

NSTALLATION

.

If Checks 1 through 6 have been satisfactory, and the liner is an
acceptable size as determined by the tables in  National Fuel
Gas Code NFPA 54/ANSI Z223.1 - latest edition and in the National
Standard of Canada, CAN/CSA B149.1 and CAN/CSA B149.2 -
latest editions and amendments, then the clay tile liner can
probably be used as a vent for the gas appliances. However, the
installer must keep in mind the following factors which may
render the tile liner unsuitable for use as a vent:

• Extremely cold weather

• Long vent connectors

• Masonry chimneys with no air gap between the liner and

the bricks. (In practice, this can be difficult to detect.)

• Exterior chimneys (The tables in  National Fuel Gas Code

NFPA 54/ANSI Z223.1 - latest edition and in the National
Standard of Canada, CAN/CSA B149.1 and CAN/CSA
B149.2 - latest editions and amendments assume interior
chimneys.)

If, in the judgment of the local gas utility, installer, and/or local
codes; one or more of the above factors is likely to present a
problem, the chimney must be relined (Fix 4).

F

IX

 1 - L

INER

 

TERMINATION

Any cap or roof assembly used with a liner must be approved by
the liner manufacturer for such use. The liner and cap/roof
assembly must then terminate above the roof in accordance
with the manufacturer’s instructions.

Содержание ADV8

Страница 1: ...n to know the product better than the customer This includes all safety precautions and related items Prior to actual installation thoroughly familiarize yourself with this Instruction Manual Pay spec...

Страница 2: ...ETE THE INSTALLATION 14 FIX 1 LINER TERMINATION 14 FIX 2 CHANGE VENTING ARRANGEMENTS 14 FIX 3 REBUILD THE CROWN 14 FIX 4 RELINING 14 VIII ELECTRICAL CONNECTIONS 15 WIRING HARNESS 15 115 VOLT LINE CONN...

Страница 3: ...ATOR BLOWER MOTORS 30 FLAME SENSOR QUALIFIED SERVICER ONLY 30 IGNITER QUALIFIED SERVICER ONLY 30 BURNERS 30 XVII BEFORE LEAVING AN INSTALLATION 31 XVIII REPAIR AND REPLACEMENT PARTS 31 WARNING IF THE...

Страница 4: ...ponent failures could result in heating system operational problems TO THE INSTALLER Before installing this unit please read this manual thoroughly to familiarize yourself with specific items which mu...

Страница 5: ...ing the discharge process in step 2 Use caution not to recharge your body with static electricity i e do not move or shuffle your feet do not touch ungrounded objects etc If you come in contact with a...

Страница 6: ...nstall the furnace where the combustion air is exposed to the following substances chlorinated waxes or cleaners chlorine based swimming pool chemicals water softening chemicals deicing salts or chemi...

Страница 7: ...he floor CLEARANCES AND ACCESSIBILITY Unobstructed front clearance of 24 for servicing is recommended TO P B 1 V E NT S ING LE P L E N U M 1 6 1 3 0 1 V E NT S IDE S FRO NT B A CK Top clearance for ho...

Страница 8: ...air for combustion and dilution of flue gases The following vent testing procedure is reproduced from the American National Standard National Standard of Canada for Gas Fired Central Furnaces ANSI Z2...

Страница 9: ...uipment Located in Confined Spaces a All Air from Inside the Building The confined space shall be provided with two permanent openings communicating directly with an additional room s of sufficient vo...

Страница 10: ...ned space Alternate Opening Location Equipment Located in Confined Spaces All Air from Outdoors Single Air Opening See 5 3 3 b 5 One permanent opening may be permitted provided the equipment has clear...

Страница 11: ...rd of Canada CAN CSA B149 1 and CAN CSA B149 2 latest editions and amendments Venting THIS FURNACE IS NOT DESIGN CERTIFIED TO BE HORIZONTALLY VENTED Supply Air Upflow Rotated Induced Draft Blower To r...

Страница 12: ...IANCE 80 AFUE FURNACE IS VENTED WITHOUT ADEQUATE DILUTION AIR DO NO T CONNECT AN 80 FURNACE TO A MASONRY CHIMNEY UNLESS THE FURNACE IS COMMON VENTED W ITH A DRAFT HOOD EQ UIPPED APPLIANCE O R THE CHIM...

Страница 13: ...correctly installed and in good condition Remove the lowest existing vent connector and examine the inside of the elbow or tee at the base of the liner A small amount of soot may be considered accept...

Страница 14: ...If the combustion air supplied to the furnace will be contaminated with compounds containing chlorine or fluorine a liner of AL294C stainless steel should be used If a metal liner is not present a cla...

Страница 15: ...THE UNIT MUST BE POLARIZED AND GROUNDED WARNING TO AVOID INJURY ELECTRICAL SHOCK OR DEATH DISCONNECT ELECTRICAL POWER BEFORE SERVICING OR CHANGING ANY ELECTRICAL WIRING CAUTION LABEL ALL WIRES PRIOR T...

Страница 16: ...istance between the neutral white connection and one of the burners 2 Resistance should measure 10 ohms or less This furnace is equipped with a blower door interlock switch which interrupts unit volta...

Страница 17: ...cooling and dehumidistat call for dehumidification This lower blower speed enhances dehumidification of the conditioned air as it passes through the AC coil For proper function a dehumidistat applied...

Страница 18: ...he approved furnace gas input rating and gas types The furnace must be equipped to operate on the type of gas applied This includes any conversion kits required for alternate fuels and or high altitud...

Страница 19: ...nds is measured The actual firing rate of the furnace is Input 1 000 heating value of the gas X 3600 constant 52 6 meter time for 1 ft3 of gas Input 3 600 000 52 6 Input 68 400 Btu h METER TIME IN MIN...

Страница 20: ...s piping the installer must supply a ground joint union drip leg manual shutoff valve and line and fittings to connect to gas valve In some cases the installer may also need to supply a transition pie...

Страница 21: ...pressure testing the supply piping system with pressures in excess of 1 2 psig 3 48 kPa This unit must be isolated from the gas supply system by closing its manual shutoff valve before pressure testin...

Страница 22: ...ernal to the furnace cabinet WARNING BEFORE PERFORMING ANY SERVICE ON THIS FURANCE DISCONNECT THE MAIN POWER SUPPLY DO NOT OPERATE THE FURNACE WITHOUT CIRCULATIONG AIR FILTERS IN PLACE PROPANE GAS PIP...

Страница 23: ...rminals are energized Circulator blower runs integrated control module monitors safety circuits continuously R and G thermostat contacts open completing the call for fan Circulator blower is de energi...

Страница 24: ...or as some types of gas are heavier than air 7 If you smell gas after five minutes immediately follow the instructions on page 3 of this manual If you do not smell gas after five minutes move the furn...

Страница 25: ...asure gas manifold pressure with burners firing Adjust manifold pressure using the Manifold Gas Pressure table shown below 8 Remove regulator cover screw from the low LO outlet pressure regulator adju...

Страница 26: ...ol module fuse to verify airflow quantity The green CFM LED blinks once for each 100 CFM of airflow 1 Determine the tonnage of the cooling system installed with the furnace If the cooling capacity is...

Страница 27: ...is within the 30 60 F rise range for the 70 kBtu This setting will keep electrical consumption to a minimum Set the Heat speed DIP switches to A 7 Select the desired heating speed tap by positioning...

Страница 28: ...It may also open if the power supply is interrupted while the furnace is firing The auxiliary limit control is suitable for both horizontal right and horizontal left installations Regardless of airflo...

Страница 29: ...ic charge to ground 2 Firmly touch a clean unpainted metal surface of the furnace away from the control Any tools held in a person s hand during grounding will be discharged 3 Service integrated contr...

Страница 30: ...recommended on adhesive container Spray adhesives for use with permanent metal filters can be found at some hardware stores BE SURE AIRFLOW DIRECTION ARROW POINTS TOWARDS THE BLOWER Inspect filter If...

Страница 31: ...at least three times Verify cooling and fan only operation Review the Owner s Manual with the homeowner and discuss proper furnace operation and maintenance Leave literature packet near furnace XVIII...

Страница 32: ...LASHES Induced draft blower pressure switch contacts sticking Shorts in pressure switch circuit Inspect pressure switch hose Repair if necessary Inspect flue for blockage proper length elbows and term...

Страница 33: ...or proper sensor alignment Check inlet air piping for blockage proper length elbows and termination Compare current gas pressure to rating plate info Adjust as needed Turn power OFF prior to repair Tu...

Страница 34: ...I NDUCED BR GND W H W H BK BR R D G N BU B R W H AUXI LI ARY L I MI T CONTROL S RD BU W H VAC 115 VAC 24 PR BK R D O R YL YL BK EAC N EAC H EL ECTRONI C I N TEG R ATE D C O N TR O L M O D U LE I N TE...

Страница 35: ...YL RD BK W H I NDUCED BR W H W H BK BR RD GR BL BR W H AUXI LI ARY RD BL VAC 115 VAC 24 BK RD OR YL YL EAC N EAC H ELECTRONI C I NTEGRATED CONTROL M ODULE I NTEGRATED CONTROL M ODULE AI R CLEANER HUM...

Страница 36: ...auses of product failure They are simple to service and forgiving to operate We use quality materials and components Finally every unit is run tested before it leaves the factory That s why we know Th...

Отзывы: