background image

3

English

Before using, it is necessary to connect 
to the sewer (the device drain-overflow 
is not included into delivery set). 
To prevent moisture under the bath, the 
joints between the bath and the wall 
must be sealed with sanitary silicone. 
Fill the bath by ¾ of the volume and seal 
the joints between bath and the wall 
with a silicone sealant (not included in 
delivery set). It is better to use sealant 
that meets the properties of PH-
neutrality, colorlessness. 
 
Attention! Sealant needs some time to 
harden. It is forbidden to use item within 
24 hours after installation.

In the case if installation of a bathtub or 
installation near the bathtub wares in 
such a way to the bath for maintenance 
and repair will be limited, work to ensure   
should be payed by the consumer!

Product 

maintenance

Attention! 
For correct operation of the system 
it is required to install puriification 
filters at feed pipelines with degree of 
purification of 100-300 micron.

•  For the avoidance of damage of the 

surface of the product it is not allowed 
to use water of temperature more 

than 60°С.

•  Use only mild detergents and soap for 

cleaning of the item.

•  Do not use corrosive washing agents or 

abrasive pastes for cleaning of the item.

•  Accute contamination on the surface 

is reccomended to treat with diluted 

vinigar and wash off with water.

•  Shallow scratches (for acrylic parts 

of the item) can be removed with fine 

grid sandpaper (grade 2000).

Producer has a right to introduce 
change of component parts that has 

no effect on appearance and functional

-

ity of product. All parameters indicated 
in this instruction have formal meaning. 
Producer reserves the right for technical 
changes.

Содержание Sensation W30A-170-075W-A

Страница 1: ...SENSATION W30A 170 075W A W30A 180 080W A WMA W30A 170 075W A ENG RUS...

Страница 2: ...well as with a modified frame is not allowed The legs are used to set the level of the bath and adjust the gap between the bath panel and the floor The bathtub should be installed on all legs of supp...

Страница 3: ...ensure should be payed by the consumer Product maintenance Attention For correct operation of the system it is required to install puriification filters at feed pipelines with degree of purification...

Страница 4: ...4 7 1 5...

Страница 5: ...5 PH 24 100 300 60 2000...

Страница 6: ...S 170 75 W30A 170 075W A W30A 170 075W P W91C 150 070W R W30A 170 075W S 180 80 Bath W30A 180 080W A Front panel W30A 180 080W P Metal frame W30A 180 080W R Side panel W30A 180 080W S 180 80 W30A 180...

Страница 7: ...7 700 300 5 0 0 350 400 1 7 0 0 700 300 5 0 0 350 400 1 5 0 0 Sewage outlets 440 385 60 600 350 387 660 55 850 1700 815 750 420 475 50 600 345 400 581 680 55 900 1800 1180 800...

Страница 8: ...02 front panel 1 03 bracket for shelf 3 04 screw 4 2 16 4 2 16 3 05 screw 3 9 32 3 9 16 2 06 decorative cap 2 07 bracket 2 08 washer 12 12 4 09 nut M12 12 4 Metal frame components 10 metal frame 1 11...

Страница 9: ...15 stud M12 12 4 16 stud M12 12 2 sticker AM PM AM PM 1 9 3 8 6 10 4 5 2 7 16 14 13 11 15 12 170 Bathtub components 170 01 bath 1 Front panel components 02 front panel 1 03 bracket for shelf 3 04 scre...

Страница 10: ...10...

Страница 11: ...11...

Страница 12: ...12...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ......

Страница 16: ...AM PM Europe GmbH Torstrasse 177 D 10115 Berlin www ampm world com 08 2018...

Отзывы: