102-000011 - IG110218-B.0
7
Put adjacent section in place
8
Connect wiring
Put adjacent section in grid at designated position.
Connect wiring quick-connects. Wiring can be done
before putting adjacent fixture in grid if enough space is
not available.
9
Connect brackets
10
Ensure alignment
Slide fixtures together aligning connector brackets to slots
on other section. Tighten set screws on connector brack-
ets and attach both fixtures with provided 8-32 screws.
Make sure the two sections are aligned. Attach newly
installed fixture to 1/4-20 rods in ceiling as outlined in steps
2 and 3.
Installation: Joining Straight Sections
If joining straight sections,
continue with steps 7-10.
If joining miter sections,
continue with steps 11-14.
If installing single sections,
go to step 15.
SHOCK HAZARD! May result in serious injury or
death.
Turn power OFF at circuit breaker prior to
installation or servicing.
!
DO NOT PINCH OR PUT EXCESSIVE TENSION ON
WIRES
while joining sections or reattaching end
caps.