Operation Verification
3.3
Operation Verification
The following sections describe how to verify the correct functioning of the
Outdoor Units, Indoor Units, Ethernet connection and data connectivity.
3.3.1 CPE-IDU-1D
LEDS
Table 3-2: CPE-IDU-1D LEDs
Name
Description
Functionality
POWER Power
Indication
Off – IDU is not powered or power failed
Green – IDU power is OK
ETH
Ethernet link status
(Ethernet integrity)
Off – No Ethernet connectivity has been detected
between the outdoor unit and the device
connected to the indoor unit
Green – Ethernet connectivity has been detected
between the outdoor unit and the device
connected to the indoor unit
WIRELESS
Wireless link status
Off – SU is not associated with an AU/
µ
BST
Green – SU is connected with an AU/
µ
BST
* After power-up, the WIRELESS LED illuminates until self-test is finished.
3.3.2 CPE-ODU-PRO
LEDs
To verify the correct operation of the SU – ODU, examine the LED indicators
located on the bottom panel of the outdoor unit.
The following tables list the provided LEDs and their associated indications.
NOTE
Verifying the correct operation of the Outdoor Unit using the LEDs, as described below, is only
possible after the configuration and alignment processes are completed.
BreezeMAX PRO CPE
27
Содержание BreezeMAX PRO CPE
Страница 1: ...BreezeMAX BreezeMAX PRO CPE Manual S W Version 1 0 2 September 2005 P N 214094 ...
Страница 2: ......
Страница 8: ......
Страница 10: ......
Страница 12: ...Contents 4 10 SU Parameters Summary 55 Appendix A Preparing the SU IDU ODU Cable 57 BreezeMAX PRO CPE xii ...
Страница 14: ......
Страница 16: ......
Страница 17: ...1 1 Chapter 1 Product Description In This Chapter Introducing BreezeMAX PRO CPE page 2 Specifications page 4 ...
Страница 38: ......
Страница 46: ......
Страница 73: ...A A Appendix A Preparing the SU IDU ODU Cable ...