SW1000 Installation and Operation Instructions
Page 22
For Assistance: [email protected] +1 (909) 591-8431 PUD3448R2-1
Power Button
Figure 25
Power
Button
Post-Installation Functions Check
The power button is located at the base of the tower
[Figure 25].
1. Using a slim object such as a pencil or pen, push
the power button.
2. When the SW1000 bootup sequence is complete,
the barrier will move to the home position and enter
controlled passage mode.
NOTE
SW1000s manufactured before August 2015
will have a power key switch installed inside the
access panel instead of a power button.
NOTE
Verify the barrier is centered properly in the home position. If the barrier home position needs to be reset, refer to
the SW1000 Configuration section beginning on Page 26.
Powering On / Off
OPEN ENTRY
TEST
PROCEDURE
GATE RESPONSE
Activate the lane in the entry direction.
•
The barrier moves to the open position.
•
The barrier returns to the home
position after 6 seconds.
Perform the following gate functionality tests to validate basic gate operation. Tests are provided for Open Entry,
Open Exit, Breakaway, and Emergency Override
.
The following is assumed (Open Entry and Open Exit tests only):
• The access control system is operational and all access control wiring to the gate is connected.
• Valid access cards or activation buttons are on hand for activating the gate.
Testing Lane Functionality
Unsecured Side
Secured Side