6.  Connect appropriate signaling notification devices to AC FAIL & BAT FAIL (Fig. 1b, pg. 5) supervisory
 

relay outputs.

7.  To delay AC reporting for 2 hrs. set dip switch [AC Delay] to OFF position (Fig. 1c, pg. 5).
 

To delay AC reporting for 1 min. set dip switch [AC Delay] to ON position (Fig. 1c, pg. 5).

 

Note: Must be set to ON position for Burglar Alarm Applications.

8.  To enable Fire Alarm Disconnect set DIP switch [Shutdown] to ON position (Fig. 1c, pg. 5).
 

To disable Fire Alarm Disconnect set DIP switch [Shutdown] to OFF position (Fig. 1c, pg. 5).

9.  Trigger terminals are end of a line resistor supervised (10k ohms). Opening or shorting trigger terminals 
 

will cause [DC] output to shutdown (Fig. 1d, pg. 5).

10.  Place a jumper for non-latching FACP. A momentary short on these terminals resets FACP latching
 

[Trigger EOL Shutdown] (Fig. 1e, pg. 5).

11.  For Access Control Applications: mount tamper switch (Honeywell Model 112 or equivalent) at the top of 
 

the enclosure. Slide tamper switch bracket onto the edge or the enclosure approx. 2” from the right side 

 

(Fig. 5, pg. 7 or Fig. 7, pg. 9)

 

Connect tamper switch wiring to the Access Control Panel input or the appropriate reporting device.

Wiring:

Use 18 AWG or larger for all low voltage power connections.
Note: Take care to keep power-limited circuits separate from non power-limited wiring (220VAC, Battery).

Maintenance:

Unit should be tested at least once a year for the proper operation as follows:
Output Voltage Test: Under normal load conditions, the DC output voltage should be checked for proper 
voltage level eFlow104NV: 24VDC nominal rated @ 10A max.
Battery Test: Under normal load conditions check that the battery is fully charged, check specified voltage
(24VDC @ 26.4) both at battery terminal and at the board terminals marked [– BAT +] to ensure that there is no 
break in the battery connection wires.
Note: Maximum charging current under discharges is 1.54A.
Note: Expected battery life is 5 years, however it is recommended changing batteries in 4 years or less if needed.

LED Diagnostics:

Power Supply/Charger

Red (DC)

Green (AC/AC1)

Power Supply Status

ON

ON

Normal operating condition.

ON

OFF

Loss of AC. Stand-by battery supplying power.

OFF

ON

No DC output.

OFF

OFF

Loss of AC. Discharged or no stand-by battery. No DC output.

Power Distribution Module

Green (AC)

Power Distribution Module Status

ON

Normal operating condition.

OFF

No Power Output.

Содержание eFlow104N16DV

Страница 1: ..._____ Address ____________________________________________________ Phone ______________________ eFlow104NV eFlow104NXV 10A 24VDC eFlow104N8V eFlow104NX8V 10A 24VDC Eight 8 Fused Outputs eFlow104N16V e...

Страница 2: ...ange V eFlow104NV 20 17 26 4 20 28 26 4 10A 2 7A 6 3A 250V 15A 32V 700 N A 1 P eFlow104NXV P eFlow104N8V 20 17 26 4 20 28 26 4 10A 2 7A 6 3A 250V 15A 32V 700 PD8 8 2 5A P eFlow104NX8V 2 5A P eFlow104N...

Страница 3: ...y For auxiliary device connection this output will not be affected by Low Power Disconnect or Fire Alarm Interface Connect device to terminals marked AUX Fig 1f pg 5 5 For Access Control applications...

Страница 4: ...wiring to the Access Control Panel input or the appropriate reporting device Wiring Use 18 AWG or larger for all low voltage power connections Note Take care to keep power limited circuits separate f...

Страница 5: ...is present Contact rating 1A 30VDC A removed battery is reported within 5 minutes Battery reconnection is reported within 1 minute power limited Fig 1b pg 5 BAT Stand by battery connections Maximum ch...

Страница 6: ...2 3 4 5 6 7 8 D1 INPUT R1 LED From Power Supply Board Factory Installed Replace fuses with the same type and rating 3 5A 250V DC Output to devices 1P 8P Power Outputs 1N 8N Common Outputs N COMMON POW...

Страница 7: ...AC Supervision Circuit Battery Connections Keep power limited wiring separate from non power limited Use minimum 0 25 spacing 7AH Rechargeable batteries are the largest batteries that can fit in this...

Страница 8: ...ptional All field wiring connections must be made employing suitable gauge CM or FPL jacketed wire or equivalent substitute Optional battery enclosure must be mounted adjacent to the power supply Note...

Страница 9: ...eries are the largest batteries that can fit in this enclosure An external battery enclosure must be used if using the 40AH or 65AH batteries DC Output to devices refer to Fig 3a 3b for board configur...

Страница 10: ...tional All field wiring connections must be made employing suitable gauge CM or FPL jacketed wire or equivalent substitute Optional battery enclosure must be mounted adjacent to the power supply Note...

Страница 11: ...342 9mm x 330 2mm x 82 6mm 1 40 36mm 1 40 36mm 4 85 123mm 4 85 123mm 1 40 36mm 1 40 36mm 5 10 130mm 5 10 130mm 13 0 330mm 5 10 130mm 6 5625 167mm 1 20 31mm 1 20 31mm 1 20 31mm 3 25 83mm 3 25 83mm 3 25...

Страница 12: ...mm 1 25 31 75mm 1 25 31 75mm 1 1 27 94mm 1 1 27 94mm 0 79 20 06mm 1 1 27 94mm 0 91 23 114mm 0 91 23 114mm 1 375 34 925mm 1 125 28 575mm 15 5 393 7mm 4 615 117 22mm 12 23 310 64mm 4 615 117 22mm 1 5 38...

Страница 13: ...Thermal Supervisory Relay 15 45 2312 24TB Photoelectric 0 12 50 2412 12 volt Photoelectric 0 12 77 2424 Photoelectric 0 10 41 2451 Photoelectric 0 10 39 2451TH with B402B Base Photoelectric 0 10 39 2...

Страница 14: ...trol of up to 2 two Altronix eFlow power output s via LAN and or WAN Monitor real time diagnostics DC output voltage output current AC battery status service input trigger state change output state ch...

Страница 15: ...sponsible for any typographical errors 140 58th Street Brooklyn New York 11220 USA phone 718 567 8181 fax 718 567 9056 website www altronix com e mail info altronix com Lifetime Warranty Made in U S A...

Страница 16: ...65AH 6A 10A 1 5A 10A Over 4 Hours 10A Battery Backup Built in charger for sealed lead acid or gel type batteries Maximum charge current 1 54A Automatic switch over to stand by battery when AC fails Tr...

Отзывы: