MOSTOSTAL Plus FRAME SCAFFOLDINGS Assembly Manual
* semi-open facade, when the number of openings in the facade
is within the range of 0% to 60%
Type of facade filling
Closed facade
Vertical anchoring spacing
4 m
Horizontal anchoring spacing
every second bay
Maximum force in the anchor
(kN)
||
1,9
4,8
Maximum force in the foot
(kN)
Internal
stand
23,4
09
External
stand
52,1
Scaffolding without covering, semi-open facade*
Gate crossing option
Working platform load of 2 kN/m²
Safety platform 1 kN/m²
* semi-open facade, when the number of openings in the facade
is within the range of 0% to 60%
Type of facade filling
Closed facade
Vertical anchoring spacing
4 m
Horizontal anchoring spacing
every second bay
Maximum force in the anchor
(kN)
||
2,8
4,8
Maximum force in the foot
(kN)
Internal
stand
17,1
10
External
stand
55,1
Scaffolding without covering, semi-open facade*
Basic option
Working platform load of 2 kN/m²
Safety platform 1 kN/m²
horizontal brace
horizontal brace
pipe
– anchor fastening two stands
– anchor fastening one stand
– double V-anchor
– single anchor
– vertical brace
– vertical brace from the wall
– protective railings
– horizontal brace
– double V-anchor, one for 5 bays – horizontally
– anchor fastening two stands
– anchor fastening one stand
– double V-anchor
– single anchor
– vertical brace
– protective railings
– horizontal brace
–
double V-anchor, one for 5 bays – horizontally
3 ASSEMBLY OF SCAFFOLDINGS UP TO 34 m HIGH