22
MOSTOSTAL Plus FRAME SCAFFOLDINGS Assembly Manual
3.5.5. Scaffolding assembly up to 34 m high
* closed facade, when number of openings is less than 20%
of facade surface
Type of facade filling
closed facade
Vertical anchoring spacing
4 m
Horizontal anchoring spacing
every second bay
Maximum force in the anchor
(kN)
||
1,9
4,8
Maximum force in the foot
(kN)
internal
stand
23,4
01
external
stand
52,2
* closed facade, when number of openings is less than 20%
of facade surface
Type of facade filling
Closed facade
Vertical anchoring spacing
4 m
Horizontal anchoring spacing
every second bay
Maximum force in the anchor
(kN)
||
2,8
4,8
Maximum force in the foot
(kN)
Internal
stand
16,3
03
External
stand
55,1
– anchor fastening two stands
– anchor fastening one stand
– double V-anchor
– single anchor
– vertical brace
– vertical brace from the wall
– protective railings
– horizontal brace
– double V-anchor, one for 5 bays – horizontally
Scaffolding without covering, closed facade*
Gate crossing option
Working platform load of 2 kN/m²
Safety platform 1 kN/m²
Scaffolding without covering, closed facade*
Basic option
Working platform load of 2 kN/m²
Safety platform 1 kN/m²
horizontal brace
– anchor fastening two stands
– anchor fastening one stand
– double V-anchor
– single anchor
– vertical brace
– protective railings
– horizontal brace
–
double V-anchor, one for 5 bays – horizontally
pipe
horizontal brace
3 ASSEMBLY OF SCAFFOLDINGS UP TO 34 m HIGH