7
Side Assembly
2
Diagram 2
EV0
017
EV0489
EV
00
17
EV0489
Make sure the side bars are pushed all the
way in, you may find they need a light tap
with a wooden mallet or something similar.
(If you are going to glue your joints this is the
first point you would do this. )
50mm Scre
w
Pilot hole, it is
easiest to drill
down through the
middle of the
mortise to make
sure you get the
hole in the correct
position
EV0489
EV
042
0
Diagram 3
Internal
Internal
Diagram 4
Keep flush
at this point
Sid
e B
ase
Pla
te
EV
001
7
The side base plates should be fitted
flush to the ends of the side cills as
shown in diagram 4. Fix with 25mm
screws.
Содержание VICTORIAN OAKHAM
Страница 1: ...12 15...
Страница 26: ...26 5 Connect the next side as you did before Frame Assembly Finally attach the last gable section...
Страница 57: ...57 Finished installation 15...