38
610 x 916
Slide the
glass into the
groove of
the eaves bar
and rest it on
the base
plate.
If you have the Aluminium capping you need to slide the glazing
rubber into channels on the back of the capping. Use a Stanley knife
or scissors to cut to length, it is best to use a complete length per
side.
If you have the cedar capping you can pre load each strip with the
25mm screws. Also before you install each pane you need to run a
thin bead of silicone up each glazing bar (no greater than 5mm is
needed).
All of the capping is pre-cut to length, so sort through it placing the
capping around the building close to were you can reach it. Start by
glazing the first side section. Make sure you have the first piece of
capping to hand.
With cedar
capping use
Silicone
9
Glazing Bar
Capping
Standard cedar capping or the upgrade aluminium capping?
Glazing Rubber
NB:
Capping lists can be found at the
rear of this book. Use the lengths to
help identify each part.
NB:
Check your building is upright
and square before glazing.
NB:
Before you start glazing
check the squarness of the
greenhouse, installing an
under vent roof pane will
often tell you more than a
Glass Size 10
6
10
8
10
10
10
12
A
4
4
4
4
B
4
4
4
4
C
2
2
2
2
D
2
2
2
2
E
2
2
2
2
295x916
4
4
4
4
405x916
10
10
10
10
610x916
5
6
8
10
610x153
2
4
4
4
525x100
6
12
12
12
610x610
1
2
3
4
610x625
5
6
8
10
610x1704
6
8
10
12
Glazing
Содержание VICTORIAN OAKHAM
Страница 1: ...12 15...
Страница 26: ...26 5 Connect the next side as you did before Frame Assembly Finally attach the last gable section...
Страница 57: ...57 Finished installation 15...