![Alton VICTORIAN CHELTENHAM Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/alton/victorian-cheltenham/victorian-cheltenham_instruction-manual_2912747009.webp)
9
Frame Assembly
5
Diagram 6
Make sure the side corner bar is located
correctly and the front face is flush with the
end of the eaves bar, mark out the pilot hole
positions shown in diagram 7 and 8. Diagram
10 and 11 on the next page show the direction
the holes should be drilled in.
Diagram 7
Diagram 8
EV0503
EV
04
83
EV0415
EV0483
EV0503
38mm
28mm
22mm
41mm
Eaves bar
Eaves bar
Top View
External Side
External Front
Diagram 5
19mm
30mm
EV04
01
EV0491
80mm Sc
rew
EV06
35M
Keep faces
flush
External
Содержание VICTORIAN CHELTENHAM
Страница 1: ...11 14 Standard building Extension...