![Alton Evolution Eight Series Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/alton/evolution-eight-series/evolution-eight-series_instruction-manual_2912735042.webp)
42
Gutter and Downpipe Installation
13
Start installing your gutter
by inserting the stop end
in one end. It is a good
idea to secure this with a
clear silicone. With help
or the aid of a prop take
the gutter to the
greenhouse and fix the
end with the stop end in,
using a 25mm screw. This
should be installed as
high as possible on the
side of the greenhouse to
allow for a good fall when
fixing the other end
(diagram 51).
Now fix the other end
of the gutter slightly
lower than the first
end. If you place a
spirit level in the
gutter it would ideally
be just over the tip of
the bubble.
Once this is fixed you
can now secure the
gutter through the
other fixing points.
Fit the gutter outlet to
the downpipe and
then to the gutter,
again using clear
silicone if necessary.
It is a good idea to support the downpipe once you have fitted it to the
outlet as it is likely to drop off before you fit the downpipe bracket.
Diagram 51
External
External
Diagram 52
Содержание Evolution Eight Series
Страница 1: ...1 02 14...
Страница 49: ...49 Notes...
Страница 50: ...50 Notes...
Страница 51: ...51 Notes...
Страница 52: ...Helpline 0116 267 7091 www birstall com alton birstall com...