![Alton Evolution Eight Series Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/alton/evolution-eight-series/evolution-eight-series_instruction-manual_2912735037.webp)
37
11
Roof Vent Installation
Take the vent frame that is ready
assembled and fix the vent hinge to one
end through the 4 pre drilled holes
using the 19mm screws, diagram 42.
Once this is in place fix the plastic vent
filler (EV0323) also with a 19mm screw,
its is
important
to make a pilot hole
before fixing the plastic filler to prevent
splitting.
Now take a 610mm x 610mm pane of
glass and locate this in the vent hinge.
Before lowering this down completely
slot the glass stops onto the open edge.
EV03
15M
EV0323
EV0251M
(Cedar capping part number: EV0151)
Diagram 42
When in position you can fix the glass in
place with the vent capping (either cedar
or aluminium) using the 25mm screws,
diagram 43. Remember if you are using the
aluminium capping system you will need
to insert the rubber seal before fixing it in
place.
Diagram 43
External
External
610
X
610
Dia. 42
Dia. 43
610
X
610
EV0313M
Rubber seal
Содержание Evolution Eight Series
Страница 1: ...1 02 14...
Страница 49: ...49 Notes...
Страница 50: ...50 Notes...
Страница 51: ...51 Notes...
Страница 52: ...Helpline 0116 267 7091 www birstall com alton birstall com...