11
Door Installation
5
Slot the door section into position as shown in diagram 13. Drill 4mm holes as indicted by the arrows.
Secure together using
60mm
screws (02-5110).
Ensure the top of the door is flush on both sides. Check that the doors are unlocked prior to fixing. It
is best to have one person on the inside doing the fixing and one person outside making sure the
panel is flush.
Diagram 13
Содержание ABCEDCOR77
Страница 1: ...12 19 FAIRFORD FAIRFORD 77 88 Fairford 77 Example...
Страница 30: ...30 Notes...
Страница 31: ...31 Notes...