02
SECTION
GENERAL INSTRUCTIONS - OVAL POOLS
GROUND
PREPARATION
Overview of the Buttress assembly
23
Inside of Pool
12
11
12
11
9
9
8
8
10
10
30
24
24
1
5
5
2
2
3
3
6
6
4
4
13
13
7
5
02
SECTION
GENERAL INSTRUCTIONS - OVAL POOLS
GROUND
PREPARATION
KEY PART NAME
Base U-Channel
Upright Channel
Inside ‘L’ Bracket
Middle ‘T’ Bracket
Outside ‘T’ Bracket
Hold Down Plate (Pressure plate)
Strap
Strap Bracket
Hardware bag, 1per set of buttresses; includes;
1/4’’ -20NCx3/4’’ hex bolt
1/4’’ -20NCx3/4’’ serrated flange hex nut
3/8’’-16NCx1’’ hex bolt
3/8’’-16NC serrated flange hex nut
No. 12x5/8’’ self-tapping screw
1/4’’-20NC nut clip
7
1
4
3
2
11
8
30
-
9
10
5
6
12
24
24
Содержание Aqua Leader Contempra
Страница 1: ......
Страница 6: ...02 SECTION GENERAL INSTRUCTIONS OVAL POOLS GROUND PREPARATION Hardware for gibraltar pools...
Страница 33: ......