![Alto-Shaam HALO HEAT 200-HFT Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/alto-shaam/halo-heat-200-hft/halo-heat-200-hft_users-installation-operation-and-maintenance-manual_2912284011.webp)
#813/22
INSTALLATION
/
OPERATION
/
SERVICE
• 10.
SERVICE SECTION
Control Box
Terminal Block
Heat Cable
Always disconnect unit from power source before cleaning or servicing.
If the power cord needs replacement, contact factory for exact replacement.
Use of any other cord may result in electrical or fire hazard.
Thermostat
Indicator Light
On/Off Switch
Electrical cord
Cord Bushing
Heat Guard
Heat Guard
Spacer
Bulbs and
Receptacles
Sneeze
Guard
Содержание HALO HEAT 200-HFT
Страница 12: ... 813 22 INSTALLATION OPERATION SERVICE 11 ...
Страница 13: ... 813 22 INSTALLATION OPERATION SERVICE 12 ...
Страница 14: ... 813 22 INSTALLATION OPERATION SERVICE 13 ...
Страница 15: ... 813 22 INSTALLATION OPERATION SERVICE 14 ...
Страница 16: ... 813 22 INSTALLATION OPERATION SERVICE 15 ...
Страница 17: ... 813 22 INSTALLATION OPERATION SERVICE 16 ...
Страница 18: ... 813 22 INSTALLATION OPERATION SERVICE 17 ...
Страница 19: ... 813 22 INSTALLATION OPERATION SERVICE 18 ...