8 | 20
5 Starting up
NM1-IP-4L-12E/24E:
1.
The measuring system is to be leveled vertically with the cable gland pointing down.
2.
The tilt measuring system is to be mounted to a vertical surface on the object. The mounting holes
are visible after remove of the lid.
3.
Connect the tilt measuring system according to the terminal assignment. Mind the EMC-instructions.
4.
Switch on supply voltage.
5.
Allow the measuring system approx. 15 minutes to warm up.
6.
The possibly necessary zero-point adjustment is to be performed.
7.
The function and calibration of the tilt measuring system is to be checked
8.
In order to accomplish the EMC and IP 65 protection, the lid is to be closed carefully right after the
initial start-up.
NM2-IP-4L-12E/24E:
1.
The measuring system is to be leveled horizontally
2.
The tilt measuring system is to be mounted to a horizontal surface on the object. The mounting
holes are visible after remove of the lid.
3.
Connect the tilt measuring system according to the terminal assignment. Mind the EMC-instructions.
4.
Switch on supply voltage.
5.
Allow the measuring system approx. 15 minutes to warm up
6.
The possibly necessary zero-point adjustment is to be performed.
7.
The function and calibration of the tilt measuring system is to be checked
8.
In order to accomplish the EMC and IP 65 protection the lid is to be closed carefully right after the
initial start-up.
Содержание NM1 4L Series
Страница 15: ...15 20 Housing Dimensions NM1 NM2 ...
Страница 17: ...17 20 Datasheet Accustar ...
Страница 18: ...18 20 ...
Страница 19: ...19 20 ...
Страница 20: ...20 20 Subject to modifications All information describe our products in general form ...