16
7.1. CUE LIGHT OPERATION
CUE LIGHTS system work flow
-Producer/Director on EC-200 master presses the STBY –standby- key to prevent next scene
preparation. RED lights flashing on both sides on all wall stations and receivers connected on
this line.
-Operator/artist of any wall station ES-203 CL or receiver ER-200 sees the red light flashing and
depresses STBY as acknowledge so turning RED light steady on all connected wall stations,
receivers and master panel.
-Producer presses the GO key indicating scene to run immediately. GREEN lights lit steady on
both sides on all connected wall stations or receivers showing scene to rush.
-When scene is at finish, producer presses the CLEAR key, all lights goes off on both sides. A
new scene process can be initiated.
-It is up to Producer to run the GO straight without the previous STBY confirmation from the
receivers.
-Operator/artist can not initiate a cue light sequence.
ES-203 CL DUAL CHANNEL DESK STATION