background image

1. Battery Installation and Wiring Diagram 

  

Battery Cable Kit, Precision Temperature Sensor / Smart AlphaGuard or Battery Sense Harness

Smart AlphaGuard (Embedded)

 — use Battery Harness, p/n 875-848-20, 

 

         

(2 battery strings) 

— use p/n 875-848-21,

 

         

(3 battery strings) 

— use p/n 875-848-22,

 

         

(4 battery strings) 

— use p/n 875-848-23.

Re-use existing External Alphaguard Battery Sense Harness by installing a retrofit kit. 

External AlphaGuard Battery Sense 

Harness to Smart AlphaGuard (1 battery string

) — use retrofit cable p/n 875-910-20,

(2 battery strings) 

— use p/n 875-910-21,

(3 battery strings) 

— use p/n 875-910-22,

(4 battery strings) 

— use p/n 875-910-23.

Precision Temperature Sensor (PTS), p/n 746-

331

-20 

CAUTION!

Use 1/4-20 x 3/4” (19mm) bolts for threaded insert terminals. If using a spacer for the in-line fuse link, use 1/4-20 x 

1” (25.4mm) bolts. 

3/4" (19mm) x 

1/4-20 Bolt

Split Washer
Flat Washer

Battery Sense Cable 

or RTS

Battery Cable
Battery Terminal

Nut

Split Washer
Flat Washer

Battery 

Cable
In-Line Fuse Link

Flat Washer
1" (25.4mm) or 

3/4" (19mm) x 

1/4-20 Bolt

1" (25.4mm) x 

1/4-20 Bolt

Flat Washer

Split Washer

Spacer
Battery 

Terminal

Fuse

Load batteries into cabinet with the positive terminals (+) facing forward.

Torque all nuts and bolts to 110 in-lbs. (12.43N-m)

Vbatt 3A

 36V

Red, Pin 9

3A

2A

1A

A/B/C/D NEG

Black, Pin 5

Vbatt 2A

 24V

Orange, Pin 4

Vbatt 1A

 12V

Brown, Pin 10

To Power Supply

Black (String -) 0V

Red

PTS

3

3

1

11

11

3A

POS(+)

NEG(-)

NEG(-)

NEG(-)

POS(+)

POS(+)

36VDC

2A

1A

Threaded Insert Terminals

The compatibility of the XM3 SAG system with certain vaults is dictated by the length of the SAG harness. Contact 

your local sales representative for more information.

NOTE:

Отзывы: