background image

Node Power Supply Enclosure

Installation Manual

Effective: November 2018

Содержание NPS-F

Страница 1: ...Node Power Supply Enclosure Installation Manual Effective November 2018...

Страница 2: ...ent of equipment and or installation procedures ATTENTION NOTICE provides additional information to help complete a specific task or procedure NOTICE ELECTRICAL HAZARD WARNING provides electrical safe...

Страница 3: ...Node Power Supply Enclosure NPS and relevant installation information and is intended for the installers of the enclosure The installers must be familiar with enclosure installation as well as system...

Страница 4: ...e 17 2 2 Rack mounted Configuration 19 2 2 1 Installation Procedure 20 2 3 Wall mounted Configuration 21 2 3 1 Installation 22 2 4 Floor mounted Configuration 23 2 4 1 Installation 24 2 5 Connecting t...

Страница 5: ...the standard SPI 28 Fig 2 11 Cover Removal 28 Fig 2 12 Coaxial Cable Connection 28 Fig 2 13 Mounting locations for the SPI RF 29 Fig 2 14 Battery Identification Label 30 Fig 2 15 NPS Battery Wiring D...

Страница 6: ...torque and connection hardware for the application Apply battery manufacturer s specified antioxidant compound on all exposed connections Verify battery terminals and or exposed connection hardware i...

Страница 7: ...intaining servicing or replacing batteries If any battery emission contacts the skin wash immediately and thoroughly with water Follow your company s approved chemical exposure procedures Neutralize a...

Страница 8: ...n proof connections 25 year life span and hardware suitable for direct burial MUST be used 6 bare copper wire from loop to the enclosure 1 2 3 4 Alpha Technologies recommends using the grounding metho...

Страница 9: ...and life An optional Fan Kit is available for the NPS enclosure see Section 2 9 Cooling Fan Kit Installation The NPS is specifically designed for indoor or outdoor installations requiring lower power...

Страница 10: ...de Tray 100XTV Batteries only Optional Safety Ground Adjacent to AC outlets Optional stainless steel ground stud Lid Removable Door Hinged removable Pole Galvanized steel brackets for wood and concret...

Страница 11: ...oad A 1 2 3 4 5 Battery Type 100XTV Runtime minutes approximate 599 294 185 129 96 150XTV 1 Battery 872 421 264 185 138 150XTV 2 Batteries 1840 910 583 415 315 3 5HP 1148 566 361 256 193 4 0HP 1269 61...

Страница 12: ...M3 615HP 36V Configured for 60V output Power Supply Input Voltage 120V 60Hz Output Load A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Battery Type 18V4 1 String Runtime minutes approximate 1183 753 548 425 34...

Страница 13: ...e mount concrete steel poles 591 557 20 Kit Wall installation 746 034 20 Kit Rack mounting 746 033 20 Kit Indoor cover 746 036 20 Kit Battery Cable 36Vdc 746 038 20 Optional Components Description Par...

Страница 14: ...3 4 7 8 9 5 2 0 Installation 2 1 Pole mounted Configuration 4 0 17 00 6 5 7 24 85 14 1 SPI Upper Mounting Strap Enclosure Grounding Point Lower Mounting Bracket Service Entrance Knockouts for Optiona...

Страница 15: ...pull downward to properly seat it on the bracket Center the enclosure on the pole 5 Mark the hole for the lower mounting bracket Lift the enclosure off the top bracket and drill the lower hole Spacing...

Страница 16: ...nstallation 5 2 1 3 4 6 7 2 0 Installation continued Upper Mounting Bracket Service Entrance Enclosure Grounding Point Lower Mounting Bracket 8 AWG minimum Copper Ground Wire to 8 Ground Rod 5 8 Throu...

Страница 17: ...n the pole 5 Secure the Lower mounting bracket on the pole using a pole strap Spacing between mounting straps for enclosures is 16 25 on center 6 The enclosure is now ready for the utility connection...

Страница 18: ...g 2 3 Steel Concrete Pole Installation 2 0 Installation continued Upper Mounting Bracket Service Entrance Enclosure Grounding Point Lower Mounting Bracket 8 AWG minimum Copper Ground Wire to 8 Ground...

Страница 19: ...9 rack 17 00 19 00 1 14 1 1 1 1 Mounting tabs set for 23 rack 2 0 2 0 17 00 23 00 24 85 14 1 6 3 4 5 2 1 Mounting locations for SPI 2 Enclosure ground point 3 Knockouts for ACI LRI Indicator lamps 4 L...

Страница 20: ...e fully charged prior to installation 1 Remove lid and door from enclosure Set aside 2 Orient the rack mounting tabs as shown below to fit the equipment rack and attach rack mounting tabs to sides of...

Страница 21: ...3 20 24 85 14 10 15 20 6 7 3 5 2 4 8 9 Fig 2 5 Dimensions Wall mounted NPS Enclosure 1 Mounting location SPI 2 Upper mounting bracket 3 Enclosure ground point 4 Lower mounting bracket 5 Service entran...

Страница 22: ...centers and mark the two lower holes at this time 4 Drill 4 5 32 pilot holes at the marks 5 Use 4 3 4 x 2 3 4 lagbolts to fasten the bracket to the wall 6 Attach the lower mounting brackets to the en...

Страница 23: ...4 0 17 00 14 10 15 20 24 85 5 2 1 4 3 6 14 10 2 00 6 50 6 50 7 7 Fig 2 6 Dimensions Floor mounted NPS Enclosure 1 Lockable door latch 2 Knockouts for ACI LRI Indicator lamps 3 Service entrance 4 Enclo...

Страница 24: ...re D circuit breakers for 120V installations and HACR heating and air conditioning breakers for 240V installations Alpha Technologies offers a high magnetic Square D circuit breaker and a BBX option a...

Страница 25: ...fety practices Connection to utility power must be approved by the local utility before installing the power supply UL and NEC require that a UL listed service disconnect switch be installed between t...

Страница 26: ...26 031 295 B0 001 Rev B 11 2018 Fig 2 8 520 R Receptacle Wiring 2 0 Installation continued NEUTRAL White L1 Black GROUND Green...

Страница 27: ...net Required Tools Phillips screwdriver 3 8 socket and driver Hammer Punch 1 Remove one of the 3 8 knockouts located in the upper rear or right side of the enclosure with a hammer and punch 2 Attach t...

Страница 28: ...tting to the body of the SPI Tighten to 130 in lbs 4 Disconnect the SPI from all power sources 5 If needed remove the cover exposing the circuit board and seizure screw assembly 6 Loosen the seizure s...

Страница 29: ...from the SPI RF 3 Position the SPI RF inside the enclosure and fix in place by reattaching the output port fitting to the body of the SPI RF 4 Disconnect the SPI RF from all power sources 5 Remove the...

Страница 30: ...reme caution must be exercised when maintaining and collecting data on the battery system Battery Identification Each battery contains a DATE CODE usually located on a sticker between the battery post...

Страница 31: ...of the 2 battery string XM2 300HP Attach the DRTS Dual Remote Temperature Probe to the negative terminal of the battery XM2 Attach the RTS about 1 3 of the way up from the battery s base with a stron...

Страница 32: ...Temperature Probe Connected to XM2 Battery Cable Connector to XM2 Power Supply Battery Cable Kit BCK Alpha p n 746 038 20 BCK 36Vdc Red Black XM3 XM2 XM2 300HP Battery Cable Connector to XM2 300HP Po...

Страница 33: ...e of 1 bolts will seriously damage the battery The only exception is the terminal with the large spacer for the in line fuse link Please refer to the battery manufacturer s threaded terminal requireme...

Страница 34: ...the connector from the lamp into the power supply s OUTPUT 1 If the PIM option is installed connect a second SPI to OUTPUT 2 7 Make sure that the SPI ALT ON switch is in the ON position 9 If the inst...

Страница 35: ...lid and close door i SMART ALPHAGUARD ACTIVE STRG A STRG B STRG C STRG D ALARMS ALPHA APPS N N OUTPUT 1 OUTPUT 2 This procedure requires a service power supply such as the APP 9015S or APP 9022S Alpha...

Страница 36: ...enclosure door and that the hardware is tightened to the manufacturer s specifications Verify the SPI tamper switch and communications modules are connected Section 2 8 Installing the XM3 Power Supply...

Страница 37: ...r more information visit www alpha com 2018 Alpha Technologies Inc All Rights Reserved 031 341 C0 001 Rev B 11 2018 Worldwide Corporate Offices North America Tel 1 360 647 2360 Fax 1 360 671 4936 Euro...