75
Index
Alpha Technologies
A
Adjusting Unit to Local Line Conditions ............... 49
Alpha, Returning Unit to for Repair ...................... 62
Alarm Off Button on SID Panel .............................. 33
Alarms
On Display Panel ........................................... 32–34
RS–232 .........................................................39–40
Starting/Stopping of RS–232 Transmission ......... 48
Alarms, Turning Off Audible Alarm ....................... 33
Alarm Port, use of and Wiring ............................... 21
Attaching an External Modem .......................... 50–57
Attaching Seismic Brackets to Floor ................ 13–14
B
Backup Generator, use of ...................................... 12
Backup Power, Measuring Battery ........................ 59
Backup Power, Time for Different Battery Strings ...
................................................................................. 73
Battery
Alarms, RS–232 ................................................. 39
Alarms, Display Panel ................................... 32–34
Charger Status ................................................... 44
Charger Test ....................................................... 64
Circuit Breaker ..................................................... 8
Connecting External Battery Pack ................. 19–20
Discharged Battery Indicators ........................ 32–33
Disposal ...............................................................iii
Inverter On/Off via RS–232 ............................ 46–47
Lifetime .............................................................. 60
Low Battery Warning .......................... 32–33, 38–39
Low Battery Shutdown ......................................... 33
Measuring Back Up Time ................................... 59
Parameters, RS–232 ..............................................
................................ See RS–232 Communications
Preventing Battery Discharge ................................ 8
Replacement ............................................ iii, 62–66
Run Time Tables ................................................ 73
Safety Checklists ............................................. ii–iii
Starting Unit with Battery Power .................... 29, 33
Storage ....................................................... ii–iii, 19
String Voltage ..................................................... 44
Buzzer, Turning Off Audible Alarm ....................... 33
C
Circuit Breakers
Battery .................................................................. 8
Dedicated for Input ............................................. 12
Input ................................................................. 7–8
Output .................................................................. 7
CFR 5000, CFR 5000RM
Alarms On Display Panel ............................... 32–34
Alarms, RS-232 .............................................39–40
Battery Backup Time, Measuring ........................ 59
Battery Charger Test ........................................... 64
Battery Circuit Breaker ......................................... 8
Changing Input/Output Voltage ...................... 67–72
Computer Connection and Control .................35–57
Connecting to Loads and Utility Line ..............16–18
Connecting to Noisy Equipment .......................... 11
Controlling Unit With Display Panel ................ 32–34
Discharged Battery Indicator ..........................32–33
Dedicated Input Line Circuit Breaker .................. 12
External Alarm Connector ................................... 21
External Battery Connector ........................8, 19–20
External IID Connector .......................................... 9
External Ground Lug ............................................. 8
External Modem .............................................50–57
Factory Repairs .................................................. 62
Fans, Cooling ................................................... 6–7
Front Panel ....................................................... 5–6
Generator, external, use of .................................. 12
Line Connection .............................................16–18
Line Synchronization ........................................... 33
Measuring Input, Output and Battery Parameters ....
................................ See RS–232 Communications
Output Loading Display ....................................... 34
Output Circuit Breaker and Connectors ................ 7
Output Shutdown, How Display Panel Shows ...... 34
Output Transformer Maximum Current ............24–26
Rear Panel ........................................................ 7–9
Front Panel ....................................................... 5–6
RS–232 Connector.......................................... 9, 22
Site Specifications.............................................. 11
Starting with Battery Power ........................... 29, 33
Synchronization With Line Power ........................ 33
Testing ......................................................... 30, 45
Troubleshooting ................................. 30–31, 60–61
Turning Unit On/Off ........................................ 28–29
Unpacking Checklist ........................................ 3–4
Changing Internal Batteries ..............................62–66
Changing Input/Output Voltage ........................67–72
Charger, Battery, Test ............................................. 64
Charger, Battery, Status ......................................... 44
Checklists
Battery Safety ................................................... ii–iii
General Safety ...................................................... ii
Pre–Installation .............................................. 11–12
Common Problems ............................................60–61