4.4  

4.4  Input Connections

Input Connections

WARNING! ELECTRICAL HAZARD

INPUTS MUST BE PROTECTED BY A LISTED 

CIRCUIT BREAKER OR BRANCH RATED FUSE. 

THE CIRCUIT BREAKER OR FUSE MUST 

BE RATED 375A MAX. MULTIPLE POWER 

SOURCES ARE PRESENT, ENSURE ALL 

INPUT POWER FEEDS ARE NOT ENERGIZED 

BEFORE INSTALLING THEM. ELECTRICAL 

INSTALLATION SHOULD ONLY BE PERFORMED 

BY QUALIFIED PERSONNEL WITH PROPER 

TOOLS AND PROTECTIVE SAFETY 

EQUIPMENT. FAILURE TO REINSTALL THE BUS 

SAFETY COVER WILL CREATE AN ELECTRICAL 

HAZARD.

MAKE SURE THAT ALL FEEDER CABLES HAVE 

HEAT SHRINK APPLIED PRIOR TO TERMINATION, 

AND THAT NO-OXIDE COMPOUND IS APPLIED TO 

ALL COPPER-TO-COPPER CONNECTIONS.

NOTICE

:

Table 3. 

Input Termination Specifications

TERMINATION 

TYPE

HOLE/

STUD 

SIZE

CENTER 

TO 

CENTER

RECOMMENDED 

TORQUE VALUE

Threaded Stud

3/8 in.

1 in.

18.75 ft∙lbs

 

Step 1. 

Flip up the plastic input safety cover to gain access to 

the HOT (-) and RTN (+) input bus termination 

locations.

Step 2. 

Install the RTN (+) cables/lugs to the threaded RTN (+) 

input studs as shown in Figure 5. Tighten hardware to 

250 in-lbs.

Step 3. 

Install the HOT (-) cables/lugs to the threaded HOT (-) 

input studs as shown in Figure 6. Tighten hardware to 

250 in-lbs.

Step 4. 

Reinstall the plastic input safety cover from Step 1.

Figure 5.  RTN Input Connections 

Figure 6.  HOT Input Connections

Содержание C016-2040-10

Страница 1: ...v30 30 Distribution Panel For Telecom Broadband Technical Manual Effective January 2020...

Страница 2: ...afety information to PREVENT INJURY OR DEATH to the technician or user WARNING FUMES HAZARD FIRE HAZARD WARNING provides flammability safety information to PREVENT INJURY OR DEATH to the technician or...

Страница 3: ...lease contact Alpha Technologies Services Inc or your nearest Alpha representative Alpha shall not be held liable for any damage or injury involving its enclosures power supplies generators batteries...

Страница 4: ...ng the Network Cable 10 4 7 Output Connections 10 4 8 Circuit Breaker Installation 11 4 9 Polarity Check 11 4 10 Display Power 11 4 11 Installation Checklist 11 5 0 Operation 12 5 1 Overview 12 5 1 1...

Страница 5: ...5 4 Information 18 5 6 Advanced 18 5 6 1 Raw Data 18 5 6 2 Configuration 18 5 6 3 Test Modes 18 5 6 4 Restore Defaults 18 5 7 Review System Status via the Embedded Web Server 19 5 7 1 Default Static...

Страница 6: ...breaker position 4RU distribution panel with 40A connectorized outputs and an advanced touch screen display Breakers are available for this panel in ratings from 2A up to 30A 2 2 2 2 Features Feature...

Страница 7: ...sembly the operating ambient temperature of the rack environment may be greater than room ambient Therefore take care to install the equipment in an environment compatible with the maximum ambient tem...

Страница 8: ...into the mounting ears see Figure 3 4 3 4 3 Chassis Ground Chassis Ground DO NOT ENERGIZE THE PANEL BEFORE CHASSIS GROUND IS CONNECTED CAUTION The chassis ground is located in the side of the panel A...

Страница 9: ...BLES HAVE HEAT SHRINK APPLIED PRIOR TO TERMINATION AND THAT NO OXIDE COMPOUND IS APPLIED TO ALL COPPER TO COPPER CONNECTIONS NOTICE Table 3 Input Termination Specifications TERMINATION TYPE HOLE STUD...

Страница 10: ...f remote monitoring over the network is required complete the following steps to connect the Ethernet module with embedded web server NOTE For initial configuration it is recommended to use a crossove...

Страница 11: ...then tighten the captive screws 4 9 4 9 Polarity Check Polarity Check The v30 30 includes a set of LED indicators inside of the panel to ensure correct polarity of the input terminations see Figure 11...

Страница 12: ...LARMS Adjustable overload alarm threshold per bus 40 100 Bus overload Bus overload Warning 10 of alarm threshold Over voltage greater than 56 0 V Under voltage less than 47 0 V Bus redundancy Bus redu...

Страница 13: ...and Warning Alarms In alarms list bus and module will be displayed for module in overload 5 1 2 5 1 2 Firmware Icons Firmware Icons 5 1 2 1 5 1 2 1 Alarm Icons Alarm Icons Alarm icons appear when at l...

Страница 14: ...minor alarm bus overload warning Red Bus in major alarm bus overload and or high or low voltage 5 2 2 5 2 2 Display Per Breaker Status Display Per Breaker Status Asterisks indicate that each channel...

Страница 15: ...jor alarm has been detected Orange White Gradient At least one minor alarm has been detected and no major alarm 5 3 5 3 Module Detail Module Detail To access this screen press any breaker status icon...

Страница 16: ...back to old ampacity 5 3 2 2 5 3 2 2 Breaker Load Breaker Load Breaker load calibration can be adjusted by pressing the plus and minus buttons 5 3 2 3 5 3 2 3 Alarm Threshold Alarm Threshold Individua...

Страница 17: ...user for permission to proceed with touch calibration Follow instructions on screen to continue 5 5 3 5 5 3 Settings Settings 5 5 3 1 5 5 3 1 Input Feeder Size Input Feeder Size Press the SET button t...

Страница 18: ...m system monitoring Busses with at least 20V cannot be removed from configuration Modules and busses are automatically inventoried if data is being received by the controller 5 6 3 5 6 3 Test Modes Te...

Страница 19: ...rimary DNS 192 168 123 1 y Secondary DNS 8 8 8 8 Once you establish a connection to the embedded Ethernet module use the following credentials to gain access to the protected data and administrative p...

Страница 20: ...tination address y Configure email settings y Configure SMTP server y Enter user name email address and password y Enter email recipients y Send test email message Note SMTP server must be configured...

Страница 21: ...Up to 60 30A 30B Input Current 300A max per input 600A max total load Load Per Circuit 35A max Maximum Input Interruption Device 375A MECHANICAL Dimensions L x H x D 19 x 7 x 13 2 18 w lacing bar Wei...

Страница 22: ...ote Temperature Sensor Kit Includes 2 Probes 1 7ft Sensor to Sensor Cable 1 20ft Sensor to Sensor Cable C016 2032 10 Secondary Remote Temperature Sensor Kit Includes 2 Probes 1 7ft Sensor to Sensor Ca...

Страница 23: ...Blue Black C745 424 10 Red Red Tracer C745 438 10 Blue Blue Tracer C745 434 10 12 7 Red Black C745 421 10 Blue Black C745 425 10 Red Red Tracer C745 298 10 Blue Blue Tracer C745 299 10 12 Red Black C...

Страница 24: ...alarm monitoring 8p8c RJ 45 modular jacks 10 Circuit breaker positions A1 11 Circuit breaker positions A2 12 Circuit breaker positions B2 13 Circuit breaker positions B1 14 Output power B1 15 Output...

Страница 25: ...25 C048 781 30 R01 Rev B 01 2020 Appendix B Appendix B One Line Diagram One Line Diagram...

Страница 26: ...Technical Support 1 800 863 3364 For more information visit our website at www alpha com 2020 Alpha Technologies Services Inc All Rights Reserved Trademarks and logos are the property of Alpha Techno...

Отзывы: