Wiring of UPS module and Battery module
3.5. Installation and Operation
3.5.1. Start Up in Normal Mode
3.5.1.1. Open the terminal block cover on the rear panel. (Refer to 2.3.2.) Before
starting the installation make sure the grounding is connected properly.
3.5.1.2. Make sure the utility breaker and the UPS’ Utility breaker and Bypass
breaker are in the “Off” position.
3.5.1.3. Make sure the utility voltage matches the input voltage window of the
UPS.
3.5.1.4. Connect the utility separately to the terminal blocks of the UPS’ Utility
and Bypass inputs. Switch on the power breaker of the distribution panel
and the breakers of the UPS’ Utility and Bypass inputs. Then the UPS
will start up. Green LEDs
and
show that the Utility and Bypass
inputs are normal. UPSs with parallel function enabled will display first
figure A1, then figure A2, and then figure B. Otherwise the LCD will
display figure A1 directly followed by figure B.
A1.
A2.
B.
Page
2
3
to
4
5
Page
2
2
to
4
5