![Alpha Outback Energy Continuity 10K Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/alpha-outback-energy/continuity-10k/continuity-10k_user-manual_2905774012.webp)
Wiring of UPS module, Transformer module
※
When Transformer module is combined with UPS, connect
the utility to Transformer module first, share the utility to
UPS from Transformer module socket.
3. Please refer to the specifications of input current, output current and
recommended conductors listed below.
a. AC input and output (minimum 75
°
C copper wire)
b. Battery input
Page
21
to
4
5
Page
20
to
4
5
Model
Maximum Current
Conductor Section
6KVA(Tower/RT)
36 A
AWG
#
10
10KVA
62A/50A
AWG
#
8
Model
Maximum Current
Conductor Section
6KVA
36 A
AWG
#
10
10KVA
53A
AWG
#
8
Содержание Continuity 10K
Страница 1: ...Continuity 6K 10K USER MANUAL...