2. 5 seconds after cold starting, amber LED"
","
will be light,
intermittent audible alarm will be heard and LCD will show
sequentially as below figure-D and figure-E
D
E
4.3.2.3. Operation of measurements display
1. UPS measurements can be checked after UPS started by pressing
select key . The display sequence are as below figure-F (AC
input voltage)
figure- G (AC input frequency)
figure-H (UPS
output voltage)
figure-I (UPS output frequency)
figure-J (UPS
loading percentage)
figure-K (UPS output current)
figure-L
(Battery voltage)
figure-M (UPS inner temperature) and back to
figure-F.
F
G
H
I
J
K
L
M
Page
24
to
47
Page
25
to
47
Содержание Continuity 1000
Страница 1: ...Continuity 1000 3000 USER MANUAL...