16
Subject to change without notice | 83056600dUK – Translation of the original operating manual | ait-deutschland GmbH
3. Lay the control / sensor cables and unit supply
cable and connect:
●
Route cables through the reserve conduits (1)
and (2) only, from above into the inside of the
unit
NOTE
The figure shows a unit variant without cool
-
ing.
4. Route cables from underneath through the cable
openings in the control box (3)
5. Connect cables to the respective terminals
(
“Terminal diagram”, page 40).
Operate the controller via a PC /network
1.
During installation lay a shielded network cable
(category 6) through the unit.
2.
Plug the RJ-45 connector of the network cable
into the socket of the control unit (1).
1
NOTE
The network cable can be retrofitted at any
time.