14
Subject to change without notice | 83056700fUK – Translation of the original operating manual | ait-deutschland GmbH
9. Use spanner size SW 37 to unscrew the heating
flow.
10. Disconnect the hydraulic connections; to do this,
push the pipes apart as far as necessary.
11. Remove the 2 side retaining screws.
12.
To protect the floor and move the module box (3)
more easily: place boards (4) under it, e.g. from
the packaging material.
13.
For units up to 12 kW capacity: Lift and hold nut (1)
on the heating flow.
14. Slowly and carefully pull out the module box by
the carrying lugs (2). Ensure that none of the
pipes are damaged
15. Pull out the module box completely and place it
on the boards.