19
Subject to change without notice | 83057200dUK – Translation of the original operating manual | ait-deutschland GmbH
10 Commissioning
9
Relevant planning & design data of the system is
documented in full.
9
7KHFRPSHWHQWHQHUJ\VXSSOLHUKDVEHHQQRWL¿HG
of operation of the heat pump system.
9
System is air-free.
9
,QVWDOODWLRQ FKHFN XVLQJ WKH URXJK FKHFNOLVW KDV
been completed successfully.
1.
(QVXUH WKDW WKH IROORZLQJ SRLQWV DUH IXO¿OOHG
completely:
Ɣ &ORFNZLVH URWDWLQJ ORDG LQIHHG ¿HOG LV SUHVHQW DW
the compressor
Ɣ
The system is installed and mounted in accord-
ance with this operating manual
Ɣ
The electrical installation has been carried out
properly in accordance with this operating manual
and local regulations
Ɣ
The power supply for the heat pump is equipped
ZLWKDQDOOSROHFLUFXLWEUHDNHUZLWKDWOHDVWPP
FRQWDFWVSDFLQJ,(&
Ɣ
The level of the tripping current is compliant
Ɣ +HDWLQJFLUFXLWLVÀXVKHGDQGYHQWHG
Ɣ
Frost protection of the heat source meets the re-
quirements
Æ
“Technical data / Scope of supply“, from
page 21
Ɣ $OOVKXWRႇGHYLFHVRIWKHKHDWLQJFLUFXLWDUHRSHQ
Ɣ $OOVKXWRႇGHYLFHVRIWKHKHDWVRXUFHDUHRSHQ
Ɣ
The pipe systems and components of the system
DUHOHDNWLJKW
2. Fill out carefully and sign the notice of completion
for heat pump systems.
3. In Germany: Send notice of completion for
KHDW SXPS V\VWHPV DQG URXJK FKHFNOLVW WR
the manufacturer’s factory customer service
department.
In other countries: Send notice of completion for
KHDW SXPS V\VWHPV DQG URXJK FKHFNOLVW WR WKH
manufacturer’s local partner.
4. Arrange for the heat pump system to be
commissioned by after-sales service authorised
by the manufacturer; this is a chargeable service.
11 Maintenance
NOTE
We recommend that you sign a maintenance
agreement with an accredited heating
company.
11.1 Basic principles
The cooling circuit of the heat pump requires no
regular maintenance.
/RFDOUHJXODWLRQV±HJ(85HJXODWLRQ(&
±DPRQJRWKHUWKLQJVUHTXLUHOHDNFKHFNVEHIRUHKDQG
DQGRUIRUDORJERRNWREHNHSWIRUFHUWDLQKHDWSXPSV
7KHKHUPHWLFWLJKWQHVVDQGUHIULJHUDQW¿OOTXDQWLW\DUH
FULWHULDIRUZKHWKHUDORJERRNKDVWREHNHSWDQGOHDN
tests performed or not, and at what time intervals.
Ź
Ensure compliance with local regulations with
UHJDUGWRWKHVSHFL¿FKHDWSXPSV\VWHP
11.2 Maintenance as required
Ɣ &KHFNLQJ DQG FOHDQLQJ WKH FRPSRQHQWV RI WKH
heating circuit and the heat source, e.g. valves,
H[SDQVLRQ YHVVHOV FLUFXODWLRQ SXPSV ¿OWHUV GLUW
traps
Ɣ
Test the function of the safety valve for the heat-
ing circuit
11.3
&OHDQDQGÀXVKWKHHYDSRUDWRU
and condenser
Ź &OHDQDQGÀXVKWKHHYDSRUDWRUFRQGHQVHUVWULFWO\
according to the manufacturer's regulations.
Ź $IWHU ÀXVKLQJ WKH HYDSRUDWRUFRQGHQVHU ZLWK
chemical cleaning product: neutralise any
UHVLGXHV DQG ÀXVK WKH HYDSRUDWRUFRQGHQVHU
thoroughly with water.
11.4 Yearly maintenance
Ź
Record the quality of the heating water analytically.
,QFDVHRIGHYLDWLRQVIURPWKHVSHFL¿FDWLRQVWDNH
suitable measures without delay.