2.3 Power Meter Wiring
The electricity meter should be mounted and connected at the grid transition point
(feed-in point) so that it can measure the grid reference and feed-in power. Alpha ESS
currently provides 4 different power meter solutions:
ADL-3000:
three-/ single-phase meter (with or without CT)
SM60A:
single-phase meter
Backup Box:
three-/ single-phase meter (Contain off-grid switching and load
management)
ACR10R:
Three-phase CT electric meter
2.3.1 Meter SM60A (If Applicable)
2.3.2 Meter ADL-3000 (If Applicable)
2.3.1.1 SM60A connect (with meter plug), if applicable:
2.3.2.1 Single-phase in house
2.3.1.2 SM60A connect (with meter plug), if applicable:
Figure 38 SM60A connect (with meter plug)
Figure 39 SM60A connect (without meter plug)
Figure 43 ADL-3000 single-phase Connect (without CT, with Meter plug)
Table 1 CT meter ratio and accuracy table
For AC/Hybrid system, there are two meter needed:
ADL-3000 single-phase connection (without CT, without meter plug), if applicable:
ADL-3000 single-phase connection (without CT, with meter plug), if applicable:
Figure 42 ADL-3000 single-phase Connect (with CT, without Meter Plug)
Option 1: with Meter Plug
Figure 40 Two Meter Connect,
with Meter Plug
Figure 41 Two Meter Connect,
without Meter Plug
Option 2: without Meter Plug
INSTALLATION
INSTALLATION
LOAD
LOAD
LOAD
AlphaESS
3
5
6
6
5
6
RS485 PIN
Grid Meter
RS485 PORT
PV Meter
RS485 PORT
Meter1
Cabinet
Meter2
LOAD
NOTE
: Connect the power meter (PIN 7, 8) to the meter port of the cable
box (PIN 3, 6) using the RJ45 cable.
NOTE
: Connect the power meter (PIN 5, 6) to the meter port of the cable box
(PIN 3, 6) using the RJ45 cable.
27
28
Model
CT ratio
Accuracy
ADL3000-N/CT & 300A/5A CT
ADL3000-N/CT & 400A/5A CT
ADL3000-N/CT & 400A/1A CT
ACR10R-200A CT
ACR10R-120A CT
60
80
400
200
120
0.6 kWh
0.8 kWh
4.0 kWh
2.0 kWh
1.2 kWh