`
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 24 of 61
Your Smart Energy
Installation
Step 9: Please drill holes directly on the wall at the marking positions of the brackets. Insert the
expansion tube and pass the expansion screw through the gasket and lock with a screwdriver.
NOTE: If the drill is not long enough, you can mark the hole positions before drilling.
Figure 2.25 Removing the maintenance cover
Step 10: Remove the maintenance cover before wiring.
Figure 2.26 Wiring positive power cable
Step 11: Pass the red positive power cable through the two BAT+ waterproof rings. And fix it on the
copper bars inside the battery and inverter.
Содержание SMILE-B3
Страница 1: ...V08 Installation Operation Manual Energy Storage System ESS SMILE B3 AU ...
Страница 2: ......
Страница 6: ......