___________________________________________________________________
Alpha ESS Co., Ltd.
Page 54 of 69
Your Smart Energy
9.
Commissioning
9.1
Checking Before Power-On
No. Check Item
Acceptance Criteria
1 Mounting environment
The mounting space is proper, and the mounting
environment is clean and tidy, without foreign object.
2
Battery pack and
inverter mounting
B3-PLUS and expansion battery packs are mounted
correctly, securely, and reliably.
3 WiFi mounting
The WiFi module is mounted correctly, securely, and
reliably
4 Cable layout
Cables are routed properly as required by the
customer.
5 Cable tie
Cable ties are secured evenly and no burr exists.
6 Grounding
The ground cable is connected correctly, securely,
and reliably.
7
Switch and breakers
status
The battery breakers and all the breakers connect-
ing to the product are OFF.
8 Cable connections
The AC cable, battery cable, and communication ca-
bles are connected correctly, securely, and reliably.
9 Unused cable glands
Unused cable glands are blocked by rubber sealings
which are secured by pressure caps.