___________________________________________________________________
Alpha ESS Co., Ltd.
Page 38 of 69
Your Smart Energy
7.5
Meter & CT Connection
7.5.1
CT Connection
The CT cables have been installed with SMILE-B3-PLUS when shipped.
Please take out 2 CTs (Grid CT and PV CT) provided as accessory.
Step 1:
Buckle the Grid CT on the house-service live wire. The arrow of the Grid CT
should point to the Grid port of SMILE-B3-PLUS.
Step 2:
Buckle the PV CT on the grid live wire. The arrow of the PV CT should point
to the Grid port of PV inverter.
Step 3:
Connect the CT cables to the Grid CT and PV CT respectively.
NOTE:
The CT cable marked Grid CT should be connected to the Grid CT, and the CT cable
marked PV CT should be connected to the PV CT.