Chapter VI Operation Control Display Panel 27
2.20~2.27V* number of batteries in series; set 3.2V lithium batteries according to 3.60~3.70V* number of batteries
in series. Keep consistent with the equalizing voltage of battery.
Equa CHRG V: Prioritize the setting according to the manufacturer’s recommendation. Conduct setting according
to the following data when manufacturer’s data cannot be obtained: Set 2V lead battery according to 2.20~2.27V*
number of batteries in series; set 3.2V lithium batteries according to 3.60~3.70V* number of batteries in series.
E/C to F/C C: Prioritize the setting according to the manufacturer’s recommendation. Set 2V lead batteries
according to 0.02C~0.05C when manufacturer’s data cannot be obtained. Other connection types can be set as
1A.
Max. CHRG C: Set 50K machine as 130A, set 100K machine as 260A.
Max. DCHRG C: Set 50K machine as 130A, set 100K machine as 260A.
Max. Precharge C: Set 50K machine as 130A, set 100K machine as 260A.
CHRG/ DCHRG P: Set charging and discharging power within the rated power of the machine according to the
actual need. (It is valid only after “energy dispatching mode” in “system parameter” is set as “DC dispatching”,
and DC work mode is set as “constant power mode”.)
CHRG/ DCHRG C: Set charging and discharging current within the rated power of the machine according to the
actual need. (It is valid only after “energy dispatching mode” in “system parameter” is set as “DC dispatching”,
and DC work mode is set as “constant current mode”.)
DCHRG Inception Voltage: Conduct setting according to EOD voltage when there are no special requirements.
Dchrg End Voltage: Conduct setting according to EOD voltage when there are no special requirements.
Precharge V: Conduct setting according to EOD voltage when there are no special requirements.
Precharge to Quick Charge Voltage: Conduct setting according to EOD voltage when there are no special
requirements.
Precharge Time: Conduct setting according to client’s requirement. When the client does not require pre-charge
function, set it as 1min.
Precharge Max. C: Conduct setting according to client’s requirement. When the client does not require pre-charge
function, set it as 10A.
Charge Cutoff Current: Adopt default value.
6.2.5Parameter diagnosis interface
Содержание PWG2-100K
Страница 1: ...User s Manual PWG2 50K 100K EX Bi directional Hybrid Storage Inverter ...
Страница 2: ......
Страница 4: ......
Страница 12: ...prevail ...
Страница 33: ...Chapter V Commissioning and Operation 21 warning label on module case surface ...
Страница 49: ...Installation Records ...